Recipes

Who can use this feature?

Anyone on a project can view Recipes and run a Preview. Creating, editing and deleting Recipes is open to All Members by default, or Admins Only if a Project Admin sets this in Project Settings > Permissions.

A Recipe controls how the Diary Summary is laid out: which headings it uses, in what order, how each bullet is written, and how items are grouped. You write it once, set it as the default on your Diary template, and every summary follows it.

The more specific your Recipe, the more consistent your summaries will be from day to day.

Creating a Recipe


If you want your Diary Summary structured in a specific format, you can customise it by creating a new Recipe.

To create a new Recipe:

  • Go to Diary > Recipes and click + Create Recipe

  • Enter a name

  • Tick the content you want in the summary

    • Selected content decides what Diary information the AI receives. Anything unticked never reaches the AI, even if your instructions ask for it.

  • Edit the starter text in Instructions (up to 5,000 characters)

  • Click Run Preview to test it against sample data

  • Click Save Recipe

Your instructions control how the summary looks, but they can't change what was recorded. The AI only uses information from the Diary Entry, and keeps names, locations, quantities, times and task names exactly as recorded. Where your instructions say nothing, Aphex defaults apply, such as short bullets and leaving out empty headings.

What each content option includes
Content
What it pulls in

Notes

Note clips on the Diary Entry

Image Captions

Captions on photos

Progress

Task progress, such as on schedule, delayed or done

Weather

The Diary's weather section. Needs weather logging set up

Production

Production measures on tasks

Labour, Plant, Materials

Actuals added to the Diary. Planned resources on tasks are never used

Notes, Image Captions, Progress, Weather and Production are ticked by default.

Writing a Recipe that works every time


Anything your instructions leave open, the AI decides fresh each time, so the summary can look different from one day to the next. If something matters to you, say it in the instructions.

A good Recipe answers seven questions:

Question
Example

Who reads it, and why?

"This summary is the client's daily report."

Which headings, in what order?

"Use these headings in this order: Progress, Delays, Safety, General notes."

What goes under each heading?

"Delays: anything that stopped or slowed work, including weather, late deliveries and access issues."

How is each bullet written?

"Start with the subcontractor in bold, then the activity, then the location."

What order inside each heading?

"List items in the order they happened, earliest first."

What if a section is empty?

"If nothing was recorded, write 'No delays recorded'." Otherwise, empty headings are left out.

What should be left out?

"Leave out routine toolbox talks unless an issue was raised."

Tips

  • To keep something out of the summary, untick its content rather than writing "don't mention labour".

  • Use your team's own words. If your site says "zones", say "zones".

  • Only group by something your team records. "Group by area" only works if areas are in notes or on tasks.

Vague vs specific examples
Vague
Specific

Put delays in their own section.

Under Delays, include anything that stopped or slowed work, such as weather, late deliveries, access or plant breakdowns.

Keep it in order.

Within each heading, list items in the order they happened, earliest first. Start each bullet with the time if one is recorded.

List the subcontractors.

Under Labour, write one bullet per subcontractor: the company name in bold, then the trade, then headcount and hours.

Always show the main sections.

Always show the Delays and Safety headings. If nothing was recorded, write "No delays recorded" or "No safety issues recorded".

Highlight problems.

Put any bullet about a delay, incident or failed inspection in bold.

Add up the labour.

At the end of Labour, add one bullet with total headcount and total hours across all subcontractors.

What won't work

Lines that ask the AI to invent information or look outside today's Diary Entry are highlighted in orange when you run a Preview, with the callout "Parts of your instruction won't be used". You can still save, but those lines are ignored.

Examples and what to write instead
Example
Why
Write this instead

Convert all quantities to tonnes.

Changes a recorded value

Record quantities in the unit you want

If labour hours are missing, assume 8.

Fills a gap

Write "Hours not recorded" where hours are missing

Estimate when the slab will be finished.

A prediction

Report progress as recorded

Compare progress with yesterday.

Uses another day

Report today only

Add tomorrow's weather forecast.

Outside the Diary

Tick Weather to report recorded weather

Some instructions pass the check but still won't appear: content that isn't ticked, data that wasn't recorded, and renaming things ("call Smith Civil 'the earthworks sub'"). Totals of recorded values, like total headcount, do work.

Test with a Preview

Run a Preview to test your instructions. The Preview applies your Recipe to a sample Diary, so names won't match your project and no live Diaries are affected.

Tips

  • Change one thing at a time, then run a Preview, so you can see what each change does.

  • Run it twice. If the Previews differ in a way that matters, add a rule for it.

  • Fix any orange highlights before saving (see What won't work).

Example Recipes

Copy one into a new Recipe, tick the listed content, and adjust it. Keep the heading descriptions and example bullets, as they're what make the result consistent.

Aphex Standard (the default)

Content: Notes, Image Captions, Progress, Weather, Production.

Time-ordered shift log

For night shifts and teams who want the day in sequence. Content: Notes, Image Captions, Progress, Weather.

By subcontractor

For QSs and package managers. Content: Notes, Progress, Labour, Plant.

Commercial record

For commercial teams tracking delays, variations and claims. Content: Notes, Progress, Weather, Labour, Plant.

Daily report

For teams with a fixed daily report format. Content: Notes, Image Captions, Progress, Weather, Production.

By folder and subcontractor

For teams who review work by folder, then by who did it. Content: Progress, Production.

Setting a default Recipe


Each Diary template has a default Recipe, which every summary on that Diary uses unless the compiler picks another.

To set a default Recipe for a Diary:

  • Open the Diary template

  • In Summary Recipe, select a Recipe from the dropdown, or click + Add Recipe to create one

  • Save the template

Using a different Recipe on a Diary Entry


If the default Recipe isn't the right fit for a specific Diary Entry, you can select a different one.

To switch Recipes on a specific Diary Entry:

  • In the Summary step, click the arrow on Generate

  • Select a Recipe, and the summary regenerates using it

This only applies to that Diary Entry. The next entry starts from the template's default Recipe.

What happens when you regenerate
  • Anything you typed by hand is kept, whether you rerun the same Recipe or switch to another

  • Changed Diary information is updated in place, and anything the Diary no longer supports is removed

  • New items are added at the bottom of their heading, so time-ordered Recipes work best when you generate once most notes are in

  • Editing a Recipe only affects future summaries, not ones already written

Deleting a Recipe


To delete a Recipe:

  • Go to Diary > Recipes and find the Recipe you want to delete in the Recipes table

  • Click the on that Recipe's row

  • Select Delete

  • Type DELETE in capitals to confirm, then click Delete Recipe

Deleting Recipe Rules
  • If the Recipe is the default on any Diaries, those Diaries go back to the Aphex Standard.

  • Summaries that have already been generated aren't affected.

  • The Aphex Standard can't be deleted.