# Zones

{% hint style="info" %}
**Who can use this feature?**

Project Admins can create, draw, edit, reorder and delete Zones. All Project Users can see Zones and use them to filter and group the plan. Anyone who can edit a Task can pick its Zones by hand when the Task has no Work Area.

Zones is being rolled out project by project. If you can't see a Zones section on your Locations, it hasn't been switched on for your Project yet.
{% endhint %}

Zones split a Location into the named areas your team actually plans around, such as fire zones, grid lines, chainages, laydown areas or a subcontractor's patch. Draw each Zone once and every Task whose Work Area overlaps it is tagged automatically, so you can filter, group and share the plan by area without tagging anything by hand.

Zones sit on top of Work Areas. Your team keeps marking up Work Areas exactly as before.

<figure><img src="https://2273109354-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLu0mYklsCTm7XQm3ZGqv%2Fuploads%2FHC2abaNlHLvPAE5LsugA%2Fzones-on-the-map.png?alt=media" alt="A Map View with Zones drawn over the site and the Zones group open in the Layers panel"><figcaption></figcaption></figure>

### Create a Zone

***

Zones belong to a Location, so set them up from that Location in your Project's library. They can be added to Map Space and Model Space (Drawing) Locations.

<figure><img src="https://2273109354-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLu0mYklsCTm7XQm3ZGqv%2Fuploads%2FeWkLwTq35hPT6ht6wHLU%2Fzones-add-a-zone.png?alt=media" alt="The Add Zone window on a Location, with a Zone Name and Colour"><figcaption></figcaption></figure>

**To create a Zone:**

* Click your Project Title in the top left
* Select <kbd>Project Assets</kbd>
* Select <kbd>Location</kbd> from the menu
* Click into the Location you want to divide up
* In the `Zones` section, click <kbd>Add Zone</kbd>
* Enter a `Zone Name` and pick a `Colour`
* Click <kbd>Create</kbd>
* Draw the Zone on the map using <kbd>Polygon</kbd>, <kbd>Rectangle</kbd> or <kbd>Ellipse</kbd>

<figure><img src="https://2273109354-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLu0mYklsCTm7XQm3ZGqv%2Fuploads%2FYvhu2aw59kVhcPP2mUjZ%2Fzones-draw-a-zone.png?alt=media" alt="Drawing a new Zone on the Location map with the Polygon tool"><figcaption></figcaption></figure>

<details>

<summary>Zone Rules</summary>

* A Zone has a name, a colour and a shape. There are no dates, owners or statuses on a Zone
* Zone names must be unique within a Location. If the name is already taken you'll see `A Zone with this name already exists on this Location`
* A Zone that hasn't been drawn yet shows a `Missing Zone Area` icon in the Layers panel, so it's easy to spot which ones still need drawing
* Zones can overlap. A Task can sit in more than one Zone
* Off Site Locations can't have Zones, because they have no map

</details>

### Edit or Delete a Zone

***

Rename, recolour or redraw a Zone at any time. Tasks are re-tagged automatically when a Zone's shape changes.

<figure><img src="https://2273109354-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLu0mYklsCTm7XQm3ZGqv%2Fuploads%2FRl8N4G57U5Ky7q6V2sTo%2Fzones-edit-or-delete.png?alt=media" alt="The ... menu on a Zone, showing Edit Zone Details and Delete Zone"><figcaption></figcaption></figure>

**To edit a Zone:**

* Click your Project Title in the top left
* Select <kbd>Project Assets</kbd>
* Select <kbd>Location</kbd> from the menu
* Click into the Location
* Hover over the Zone and click `...`
* Select <kbd>Edit Zone Details</kbd> to change the name or colour, then click <kbd>Save</kbd>
* To reshape a Zone, select it on the map and drag its shape or points

**To delete a Zone:**

* Hover over the Zone and click `...`
* Select <kbd>Delete Zone</kbd>
* Click <kbd>Delete</kbd> to confirm

{% hint style="danger" %}
**Deleting a Zone removes it from every Task**

Tasks in that Zone lose the tag straight away. Published Versions keep the Zones they were published with, so past plans aren't changed. If you only want to rename or reshape an area, edit the Zone instead.
{% endhint %}

### How Tasks Get Their Zones

***

You don't need to tag Tasks yourself. A Task's Zones come from its Work Area.

<details>

<summary>How Zone Tagging Works</summary>

* **Tasks with a Work Area:** Zones are worked out from the Work Area. Any overlap counts, and a Task can be in several Zones. These Zones can't be changed by hand. Change the Work Area or the Zone instead
* **Tasks without a Work Area** (e.g. an inspection or a delivery): pick Zones by hand from the `Zone` field. The Task needs a Location first
* As soon as a Work Area is drawn on a Task, its hand-picked Zones are replaced by the ones worked out from the Work Area
* Changes to a Task's Zones are recorded in the Task's activity log

</details>

<figure><img src="https://2273109354-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLu0mYklsCTm7XQm3ZGqv%2Fuploads%2FMOVxbqnQeRwDHd9uduRZ%2Fzones-zone-column.png?alt=media" alt="The Zone column on the Gantt with the Zone dropdown open for a Task"><figcaption></figcaption></figure>

**To pick Zones for a Task without a Work Area:**

* On the Gantt, use the Column Picker <img src="https://2273109354-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLu0mYklsCTm7XQm3ZGqv%2Fuploads%2FvKmhsEo7KN1cBILxsani%2FColumn%20Picker%20Buttons.svg?alt=media&amp;token=9c6cc79d-7f88-4492-a6ea-7f2ba6418ffc" alt="" data-size="original"> to enable the `Zone` column
* Click the Zone cell for your Task
* Select one or more Zones from the dropdown

Project Admins can also click <kbd>Create New Zone</kbd> from the bottom of this dropdown.

### Filter & Group by Zone

***

Use Zones to answer questions like "what's happening in Zone 3 next week?" across your Views.

**To filter by Zone:**

* Click `Filters` and `Add Filter`
* Select `Zone` in the first dropdown
* Choose a condition in the second dropdown
* Select your Zones in the third dropdown

<figure><img src="https://2273109354-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FLu0mYklsCTm7XQm3ZGqv%2Fuploads%2FJoV7q5q4msIH1nMRiaYk%2Fzones-group-by-zone.png?alt=media" alt="The Group By menu on a Map View with Zone selected"><figcaption></figcaption></figure>

**To group by Zone on the Gantt or Map:**

* Open a Gantt or Map View
* Click the `Grouped by` menu in the top left
* Select `Zone`
* Tasks that aren't in a Zone are grouped under `No Zones`

<details>

<summary>Where Zones Appear</summary>

* **Locations:** the `Zones` section on each Location, where Admins manage them
* **Map:** Zones show as their own group in the Layers panel. Click a Zone to zoom to it
* **Gantt, Board and List:** a `Zone` field, shown as coloured tags
* **CSV export:** a `Zone` column next to Location
* **Published Versions and prints:** each Published Version keeps a copy of the Zones as they were when it was published
* **Project Insight:** filter reports by Zone, see <a href="https://help.aphex.co/docs/insight/reports/ppc-dashboard.md" class="button secondary">PPC Dashboard</a>
* **Mobile:** Zones aren't shown in the mobile app yet

</details>

See also: <a href="https://help.aphex.co/docs/planner/features/locations.md" class="button secondary">Locations</a> <a href="https://help.aphex.co/docs/planner/features/clashes-and-work-area.md" class="button secondary">Clashes & Work Area</a> <a href="https://help.aphex.co/docs/planner/features/view-controls.md" class="button secondary">Views</a>


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation by asking a question.

Perform an HTTP GET request on the following URL with the `ask` and `goal` query parameters:

```
GET https://help.aphex.co/docs/planner/features/zones.md?ask=<question>&goal=<user_goal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is what the user is ultimately trying to achieve, the reason they need the answer. Sharing it helps GitBook give you a better, more relevant answer. A goal is most helpful when it describes the outcome the user wants rather than restating the question. For example, with `ask=how do I create an API token`, a goal like `automate deployments from our CI pipeline` lets GitBook tailor the answer to that use case.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.