If your team uses Propeller to capture drone surveys and aerial imagery, you can bring that same data into Aphex. The Propeller integration uses WMTS (Web Map Tile Service) to stream live site imagery directly onto your Map, so your team plans against the most current picture of the site, without anyone downloading or re-uploading a thing.
This guide walks you through how to generate a WMTS link in Propeller, add it to your project in Aphex, and set a Layer Policy to control what shows up.
Propeller generates a unique WMTS link per site. You'll need this link to connect your survey imagery to Aphex.
In Propeller, click your User Icon → WMTS and API
Click , give the link a clear name, and select the Site you want to connect
Click
Copy the generated link - this is the link you’ll use in Aphex
Once you’ve got your WMTS link handy, you can plug it into any real-world Location in your Project.
Visit our doc for step by step instructions on how to add layers to the Map.
When Aphex connects to your Propeller WMTS link, it detects all available survey sublayers for that site. A Layer Policy controls which of those sublayers are brought into your project, keeping things clean and relevant for your team.
Because Propeller WMTS links auto-update with each new survey upload, your Layer Policy also determines how Aphex handles those incoming datasets over time.
Visit our doc for step by step instructions on how to define a layer policy.
Propeller WMTS links update automatically each time a new survey is processed and published for your site. You don't need to regenerate the link or reconnect the layer in Aphex, new datasets will appear in line with your Layer Policy, with no action needed on your end.


