Printing

Gantt

The live Gantt, and the Gantt in Published Versions can be printed to PDF.

The configured date range, filter, structure, zoom, grouping and overlays will be printed. The exception is the Resource Overlay - this cannot be printed.

Page Size

By default, the Gantt print will be optimised to A3. This can be switched to A2, A1 or A0. Increase the page size will scale the Gantt allowing more of the plan to be visible on each page.

Delay Data

By default, the delay data is included in the output. This can be turned off to exclude Progress Update colours, Done & Promised Bars and delay icons from the PDF.

Advanced Settings

Bar Colour

Pick from either Owner, Subcontractor or Shift for the Bar Colour on the Gantt print. Owner will be selected by default.

Choose whether to include a footer on the Gantt print. If the Footer is included, it will have the following information:

DataDescription

Logo

Custom Org or Project logo. Will default to Project Logo if one has been uploaded, otherwise will fallback to Org Logo.

Project Name

Name of the Project

Published Version

Name of the Published Version the print was generated from (not valid for prints from the live Gantt)

Time Printed

Time the print was generated (timezone taken from the Organisation region)

Dates

Start and end date of the time period for the specific page

Page Number

Page number out of total pages

Owners

Users who own tasks on the page

Subcontractors

Subcontractors assigned to tasks on the page

The PDF can be generated with either the Organisation logo, or the Project's logo.

Map

The live Map, and the Map in Published Versions can be printed to PDF.

The configured date range, filter, structure, grouping and overlays will be printed on the Map. The orientation and print area can be set to allow a specific section to be printed instead of the entire Map.

By default, the output will be a single page with all tasks in view appearing on the Map PDF.

A maximum of 55 tasks can appear in the tasklist for each page. If the amount of tasks exceed 55, the excess tasks will not be visible in the tasklist.

Sequence Prints

Sequence can be enabled to spread tasks out over multiple pages.

SequenceOutput

Day

A new page for each working day. Only tasks taking place on the specific day will appear on the page

Week

A new page for each week. Only tasks taking place within the specific week will appear on the page.

Month

A new page for each month. Only tasks taking place within the month week will appear on the page.

Page Size

By default, the Map print will be optimised to A3. This can be switched to A2, A1 or A0. Increase the page size will scale the Gantt allowing more of the plan to be visible on each page.

Advanced Settings

Column Data

Up to three additional data points can be shown next to their tasks on the Map Print. The information that can be selected from is:

DataDescription

Dates

Start and end date of the task

Duration

Number of days the tasks goes for

Shift

The shift assigned to the task

Status

If the task is Planned, Promised or Done

Owner

The owner of the task

Subcontractor

The Subcontractor assigned to the task

Labour

Labour that is assigned to the task

Plant

Any Plant assets that are assigned to a task

Materials

Materials that are assigned to the task

Location

The Location of the task

Choose whether to include a footer on the Map print. If the Footer is included, it will have the following information:

DataDescription

Logo

Custom Org or Project logo. Will default to Project Logo if one has been uploaded, otherwise will fallback to Org Logo.

Project Name

Name of the Project

Published Version

Name of the Published Version the print was generated from (not valid for prints from the live Map)

Time Printed

Time the print was generated (timezone taken from the Organisation region)

Location Name

Name of the Location

Dates

Start and end date of the time period for the specific page

Page Number

Page number out of total pages

Owners

Users who own tasks on the page

Subcontractors

Subcontractors assigned to tasks on the page

Logo

The PDF can be generated with either the Organisation logo, or the Project's logo.

Exceptions

Board View and the Resource Overlay are only available in the live plan, and cannot be printed