Gantt

Who can use this feature?

Project Users with Full Planner Access can create and open Gantt Views.

Group the Gantt


Gantt Views can be grouped by different properties within your plan to organise your Tasks in different ways.

To change how the Gantt is Grouped:

  • Click the menu in the top left of the Gantt

  • Select a Primary Grouping. Pick from Folder, Owner, Package, Shift or Location

  • Optionally, select a Sub-Grouping to apply another level of structure beneath the Primary Group

  • When Hide Empty Primary Groups is , only Groups that contain visible Tasks will show on the Gantt. Any Groups without Tasks in your current View will be hidden.

  • Click the menu in the top left of the Gantt

  • Select either Collapse All or Expand All


Gantt Views are very flexible and allow you to visualise any set of Tasks over time.

To change the visible Date Range on the Gantt:

  • Click at the top of the Gantt

    • Yours might also look similar to or

  • Choose your preferred mode from the selector:


Filters in Aphex let you show only what matters, whether that’s Tasks with certain properties, or ones that are missing something. Keep it simple or build something more detailed, it's up to you.

To filter the Tasks you see in a Gantt View:

  • Click at the top of the Gantt

  • In the dropdown that appears select and choose the property you'd like to filter by

  • Change the logic from options like or to or to hide or reveal the relevant Tasks

  • Click to swap between and

Using Filter Groups:

  • Groups are helpful when combining logic and logic in your filter

  • Click to create an additional filter group

See also: creating & sharing


If your Gantt looks empty, it's usually because settings like Filters, your Date Range, or the Hide Empty Groups toggle are hiding your tasks or groups. Aphex provides clear messages and icons to help you adjust your view.

Empty Gantt Message:

When no tasks or groups are visible, a message will appear in the Gantt:

Looks like your Gantt is empty Try adjusting or to reveal activities and groups

To reveal your tasks, simply click the highlighted or in the message to open the relevant panel and adjust your view settings.

Hidden Groups Notification:

When the Hide Empty Groups toggle is active, a notification appears at the top of the Gantt if any groups (Folder, Location, Owner, Package, Shift or Subcontractor) are hidden as a result:

[X] Hidden [Group Type] Adjust your and configuration to reveal hidden groups

To reveal hidden groups:

  • Click the highlighted or in the message to open the relevant panel and adjust your view settings.

  • Open [View Settings Icon] and set the Hide Empty Groups toggle to [Toggle Off Icon].

Hidden Items in Folders:

Look for the next to a Folder Row. This icon indicates the folder contains subfolders, but they are hidden by your current Filters, Date Range, or Hide Empty Toggle.

To temporarily reveal the hidden folers:

  • Click the next to the folder name. This displays the contents without changing your overall Gantt view.


Tasks on the Gantt will always be sorted by Start Date - the earlier a Task starts, the higher it will appear within it's grouping.

Aphex will hold the position of your Tasks while you make edits, and then when you're ready to re-apply the Sort Order, click in the bottom left corner.

Refreshing your Aphex window will also trigger the sort order to be re-applied to your Gantt View.


You can view your projects on a range of time scales, from a single day to a full year:

  • Head to the bottom-right corner of your Gantt

  • Use the menu to switch between Day, Week, Month, or Year

  • The Gantt will instantly update to show your plan on the scale you’ve selected


Overlays let you layer in things like baselines, critical path visibility, or daily resource demand. This means you can add extra context to your Gantt without changing up or leaving your View.

  • Click at the top of the Gantt

  • Select from Resource, Baseline, Critical Path

  • To compare the Live Plan to a previous week, select Baseline

See also: and


When viewing your Gantt, Aphex automatically calculates a Start Date, End Date, and Duration for Folders, Packages, and Parent Tasks. These adjust based on what’s visible in your View and which working calendar you chose to apply.

  • Click

  • Select Group Duration Calendar

  • Choose one out of: Project Default, 5 Day Week, 7 Day Week

  • Open the Column Picker and toggle Duration or Start / End

  • These values change dynamically with Filters or Date Range updates

  • Filtered values are marked with a icon so you know they’ve been adjusted

See also:


Turn on any Task Property as a spreadsheet-style column, then click into cells to edit, bulk-fill, or paste across Tasks.

To hide and show Gantt Columns:

  • Click the button at the top of the Gantt

  • Set the toggles to or to hide or reveal any combination of columns

  • Once a column is enabled, select any cell to change the value


Every colour and icon on the Gantt tells you something. Whether it’s a Milestone, a delay, or who is responsible for the work - you can choose what shows and how it looks.

  • Click in the top right of the Gantt

  • Select Bar Colour

  • Choose how you’d like to colour the Gantt; by Subcontractor, Shift, or Owner

  • Milestones will appear as and any associated Target Dates will be if slipped and if on track

  • Overdue Blockers will be represented with next to the end of the Task

  • Delays are shown as a on the Task Bar, displaying the total amount of days the Task has been delayed by

  • Click and toggle

See also:


Use the Gantt search to quickly find Tasks. As you type, matching Tasks are highlighted and jumped into view automatically.

To Search for Tasks:

  • Click into the Search Bar in the top left of the Gantt

  • Type in your search term

  • Press Enter on your keyboard or click the < and > icons to cycle through all matching Tasks

- Select from common options like "Next 30 Days", "Next 3 Months", "All Tasks", etc.
  • - Enter the number of days before and/or after today to create a moving window.

  • - Pick specific start and end dates using the date pickers.

  • Optional: Toggle "Show Surrounding Weeks" to add an extra week of visibility on either side of your selection

  • This will show a list of all Published Versions, and all Master Schedule Imports

  • Select any option to see how how your current plan compares to your baseline

  • Hover over the icon to see:

    • The Filtered value

    • The Total value

    Your Gantt will update instantly to reflect the new colour scheme

    Show Progress and
    Show Overdue Blockers to hide these Icons from the Gantt

    To Collapse and Expand Groups:

    Group By Rules
    • Choose a Primary and Sub Grouping to shape how your Gantt is displayed e.g. Group by Subcontractor, then by Shift, to see separate swimlanes for each combo

    • The layout updates instantly as you change grouping options

    • All Primary groupings, except Folders, can be rearranged into a custom order, per user

    • Sub Groupings only show groups that contain tasks - empty groups won’t appear

    • Folder Grouping can be switched between a nested Tree Mode and a Flattened Mode, which condenses the Folder path into a single row to save vertical space on the Gantt

    Setting the Date Range

    Date Range Options

    Preset

    Preset mode offers quick-select options for the most common project viewing timeframes. Simply click on any option to instantly apply that date range to your timeline. These ranges automatically recalculate based on today's date.

    Date Range
    Range

    Rolling

    Rolling mode creates a dynamic window of time that stays centered around today and automatically shifts forward as time passes. Enter the number of days you want to see before and/or after the current date.

    Input
    Calculated Range

    Fixed

    Fixed mode gives you complete control to select any specific start and end date. Use the date pickers to choose exactly which timeframe you want to view. Unlike other modes, this range stays fixed and doesn't change as days pass.

    Input
    Calculated Range

    Show Surrounding Weeks

    This toggle is available in all three modes and provides quick additional context around your selected range. When enabled, it adds one week of visibility before your start date and one week after your end date, making it easier to see what's coming up next or what just happened without changing your core date selection.

    Setting
    Effect on All Mod

    Filtering the Gantt

    Filter Logic and Rules
    • All as well as can be applied as a filter

    • Archived values that are still in use will appear as filter options. Unused archived values will be hidden from the filter options

    • Tasks that do not match the filter criteria will be hidden from the Gantt

    Gantt Empty States & Hidden Items

    Task Sort Order

    Sort Order Logic

    The Gantt Sort Order is fixed, and will always follow this logic:

    • First it will sort tasks by Start Date

    • If the Start Date is the same, it will then check End Date

    • If the End Date is the same, it will then apply Alphanumeric sorting

    Gantt Zoom

    Overlays

    To turn Overlays on and off:

    Group Dates & Durations

    To change your Group Duration Calendar:

    To view Group Durations & Dates on the Gantt:

    Group Duration Calendar Options
    Calendar Option
    Description

    Project Default

    Respects the non-working days of your Project's Default Calendar

    This setting only affects how Durations are displayed for Folders, Packages, and Parent Tasks. It doesn’t change individual Task calendars or impact other users.

    When a plan is published, Group Durations are always calculated using a 5 day workweek (Monday–Friday).

    Group Dates & Duration Calculations

    Start Date

    • Start date of the earliest visible Task

    End Date

    • End date of the latest visible Task

    Duration

    • Spans the Start → End Date of the group

    • Uses your selected Group Duration Calendar

    • Measured in working days of the selected Calendar

    Gantt Columns & Cells

    Keyboard Shortcuts

    Below are the keyboard shortcuts that can be used on the Gantt View

    Action
    Shortcut

    All columns

    If you have a Mac computer, you can use cmd

    Task Bar Colours & Icons

    To change the colour of Task Bars:

    To identify different Icons on the Gantt:

    Additional Gantt View Options
    • Show or hide Relationship links

    • share, duplicate, or delete your saved Gantt Views

    Gantt Search

    Views
    Resource Overlay
    Critical Path
    Task Calendars
    Print Gantt

    X Week Lookahead

    Today + (Project Lookahead Period)

    Next 30 Days

    Today + Next 30 Days

    Next 3 Months

    Today + Next 12 Weeks

    Next 6 Months

    Today + Next 25 Weeks

    Next 12 Months

    Today + Next 52 Weeks

    All Future Tasks

    From Today to Last Task

    Project to Date

    From First Task to Today

    All Tasks

    From First Task to Last Task

    Forwards

    Today + specified days into future

    Backwards

    Today - specified days into past

    Combined

    Start Date

    Selected start date

    End Date

    Selected end date

    Combined

    Off (default)

    Displays exactly the calculated range, no additions

    On

    Adds 1 week before start date + 1 week after end date to visible area

    5 Day Week

    (Mon–Fri) Static calendar

    7 Day Week

    (Mon–Sun) Static calendar

    Ctrl + 1

    All required columns

    Ctrl + 2

    Time columns

    Ctrl + 3

    User columns

    Ctrl + 4

    Resource columns

    Ctrl + 5

    Map columns

    Ctrl + 6

    Structure columns

    Ctrl + 7

    Other columns

    Ctrl + 8

    Copy

    Ctrl + C

    Paste

    Ctrl + V

    Select multiple cells

    Shift + Click (cell)

    Select multiple tasks

    Shift + Click (checkbox)

    Undo

    Ctrl + Z

    Redo

    Shift + Ctrl + Z

    New line

    Shift + Enter

    Move task and break links

    Shift + Click + Drag (task)

    Duplicate Task

    Ctrl + D

    Full rolling window centred on today

    Fixed range from start to end date

    Features

    Gantt

    Board

    List

    Map

    Tasks

    Blockers

    Calendars

    Clashes & Work Area

    Exports

    Folders

    Labour & Plant

    Locations

    Master Schedule Import

    Materials

    Owner, Assignee & Teams

    Packages

    Printing

    Publishing

    Readying & Reviewing

    Relationship Links

    Shift

    Spreadsheet Import

    Status

    Subcontractor

    Tags

    Views

    Calendars

    Who can use this feature?

    Admin users can create, edit and archive the library of available Calendars.


    Task Owners, Assignees and Admins can change the Calendar allocated to their Tasks.

    Calendars define your project’s working and non-working days. Task durations are based only on the working days set in the assigned Calendar, so Tasks won’t be scheduled on non-working days.

    Creating Calendars


    Create a custom Calendar to set specific working and non-working days that match your project’s schedule.

    To create a Calendar:

    • Click your Project Title in the top left, then select Project Assets

    • Select Calendars from the menu

    • Click

    • Add a name and choose a colour to represent the Calendar

    • Pick your base Working Days

    • Click specific days on the Calendar to mark them as Working or Non-Working exceptions

    • Optionally,

    • Click Done once you're finished editing

    • The Calendar is added to the library of Calendars the team can assign to their Tasks

    See also:


    You can edit an existing Calendar to update working days, non-working days, change its name or colour.

    • Click your Project Title in the top left, then select Project Assets

    • Select Calendars from the menu

    • Hover over the existing Calendar


    Assigning a Calendar to a Task sets its working days and controls when it can start or finish.

    • On the Gantt, navigate to the column picker and toggle on Calendar

    • Click a cell in the column to add a Calendar to the Task from the dropdown

    • See the non-working days appear with reduced opacity on the Task Bar

    See also:


    Filter by Calendar to focus on Tasks working to a certain schedule.

    • Click and

    • Select Calendar in the first dropdown

    • Select from Is or Is Not in the second dropdown

    See also: create & share

    List

    Who can use this feature?

    All Project Users have access to List Views on both Web and the Mobile App

    List View turns your Gantt into a daily to-do list. See what’s on for today, or the next day - filter by properties like Supervisor (Assignee) or Location, and report progress with a Thumbs-Up or Thumbs-Down.

    Organise your List View


    Use grouping to organise your Task List around what matters most. Sort Tasks by the team doing the work, where they're happening or how they're tracking.

    To change how List is organised:

    • Click in the top left

    • Select from Subcontractor, Owner, Schedule, Location, Package, Folder or Shift

    • Tasks and Groups will reorganise automatically


    Choose what Task details appear on each Task Card in List View. Show only the properties that matter for the day and hide all the rest.

    • Click at the top left of the List

    • Toggle any property you'd like to display on the Task Cards

    • Use the ⋮⋮ drag handles to reorder the properties on the Task Cards


    Track daily progress in List View with a simple thumbs up or down. Every update adjusts the task, schedule, and reporting, automatically.

    • Locate the Task you want to update

    • Choose to mark it on track or improved, or to record a delay

    • If delayed, select a reason, add the number of impacted days, and optionally include a comment or photo

    See also:


    Task Update Compliance shows how many Tasks have been updated for the selected day. It appears at the top of List View and summarises what’s on track, delayed, or missing updates.

    • Click

    • Toggle on Show Task Update Compliance

    • Click to dismiss


    Filters in Aphex let you show only what matters, whether that’s Tasks with certain properties, or ones that are missing something. Keep it simple or build something more detailed, it's up to you.

    • Click at the top of the List

    • In the dropdown that appears select and choose the property you'd like to filter by

    • Change the logic from options like or to or to hide or reveal the relevant Tasks

    • Click to swap between and

    See also: creating & sharing

    Spreadsheet Import

    If your plan already lives in Excel, you don’t need to start from scratch. Quickly import Task names, dates and more - turn your spreadsheet into a live plan in Aphex.


    Start by selecting your CSV file or copying data directly from your spreadsheet.

    • Click your Project Title in the top left

    • Select Import Tasks

    Tags

    Tags give you a way to label Tasks with anything that matters to your team, from safety and risk, to key priorities, review flags, or anything else. They’re multi-select, fully custom, and can be used to filter views to suit different meetings, roles, or priorities.


    Creating tags lets you build a reusable library of Tags to assign to Tasks.

    To create a new Tag:

    • Click your Project Title in the top left, then select Project Assets

    Click then select Edit
  • If the Calendar is already in use, select whether to apply changes to existing Tasks or keep their current dates unchanged

  • Select your desired Calendar in the third dropdown

    Aphex provided Calendars
    Name
    Working Days

    Five Day

    Monday, Tuesday, Wednesday, Thursday, Friday

    Project Default Calendar
    • The default Calendar will be applied to all New Tasks created in the Project

    • If you change the default later, it won’t affect existing Tasks, they’ll stay on the calendar they were originally assigned

    Non-Working Days

    Adding non-working days to a Calendar will automatically prevent tasks from being scheduled on those days. You can create multiple calendars with different non-working patterns to suit your project.

    Edit an existing Calendar

    To edit a Calendar:

    Editing a Calendar in use

    Making changes and saving a Calendar that is in use generates a prompt with the following options:

    Prompt
    Function
    Exceptions

    Save and hold dates on existing Tasks

    Assigning Calendars to Tasks

    To update the Calendar on a Task:

    Calendar Property Rules
    • Each Task can have one Calendar assigned, you can’t add multiple calendars to a single Task

    • Archived Calendars will no longer appear as an available option to add to tasks, but will still exist on any tasks they were assigned to before they were archived

    Filter by Calendar

    To set a Calendar Filter:

    Group Calendars
    Bulk Edits
    Views
    Optionally, click the > beside the property to open more options
  • Use the to hide specific values within that property from view

  • Set Visible Task Properties

    To hide or reveal properties:

    Recording Task Progress from Daily Lists

    To record Task progress from List:

    Monitoring Daily Task Progress

    Turn Task Update Compliance on or off:

    Compliance Calculation & Logic

    Task Update Compliance is based on:

    • Tasks currently visible in your List

    • The selected date

    • Progress updates

    Status categories:

    • On Schedule includes On Schedule, Move, and Shorten updates

    • Delayed is triggered by any negative update and takes priority if multiple updates exist

    • Missing Update applies when no update has been recorded for that day

    Filter your Daily Lists

    To filter a List View:

    • All as well as can be applied as a filter

    • Archived values that are still in use will appear as filter options. Unused archived values will be hidden from the filter options

    • Tasks that do not match the filter criteria will be hidden from the List

    Progress Updates
    Views

    Choose between Upload a CSV or Copy and Paste

  • Upload your CSV file, or paste your data into the importer

  • Select


  • Aphex will scan your spreadsheet and show the columns it found. Just match each one to the right Aphex property - like Task Name, Start Date, or Shift. You only need to map what you’re using.

    • Choose which columns in your spreadsheet match Aphex properties like Task Name, Start Date, End Date, Subcontractor, Shift, or Package.

    • If needed, toggle Exclude up to row to skip up to the first 10 rows - handy if your file includes notes or headers before the actual data starts

    • Select


    Get a quick sense check of what you’re about to create. We’ll show you a preview of the task names, dates, and any mapped fields so you can confirm it’s all as expected.

    • Review the Tasks you're about to import

    • If you're happy, select to add your Tasks to the Plan

    Who can use this feature?

    All Project Users can import Tasks via CSV.

    Upload or Paste your Spreadsheet

    To upload your data:

    Supported Migration Sources

    The migration tool is built to support CSV formatted data.

    If your plans are in any system with rows and columns, you can most likely either export the data directly to CSV or copy the data from the interface and paste it into a CSV or other spreadsheet.

    Should your existing data be inconsistently structured due to headings or another formatting technique, you can download an example CSV template below and paste your relevant data before importing.

    What can you import?

    The importer supports mapping of the following six properties on imported tasks. At least one mapping is required for a valid import:

    Property
    Accepted Format
    Default Value

    Map your data to Aphex

    To map properties:

    Confirm your Tasks

    To complete the import:

    What happens after the import is complete?
    • Imported tasks will be assigned to the project's default calendar and the owner undertaking the migration.

    • Assigned Project Assets, such as Packages or Subcontractors will be created automatically if required.

    Select Tags from the menu
  • Click

  • Create your custom Tag by entering the name and assign a colour

  • The Tag is added to the library of Tag the team can assign to their Tasks


  • Tags can be added to Tasks to help group and organise work across your plan, they’re a flexible way to highlight key information without changing the structure.

    To assign Tags to Tasks:

    • On the Gantt, open the column picker and toggle Tags

    • Click a cell in the column to add a Tag to the Task from the dropdown

    See also: Bulk Edits


    Filtering by Tags lets you focus on specific Tasks based on what’s been added to them. It’s a quick way to review and manage work related to a particular Tag across your plan.

    • Click then

    • Select Tag in the first dropdown

    • Select from Is, Is Not, Is Empty or Is Not Empty in the second dropdown

    • Select your desired Tag in the third dropdown

    See also: create & share Views

    Who can use this feature?

    Task Owners, Assignees and Admin users can add Tags to Tasks.


    All Project Users can create and edit Tags by default. This can be changed to Admins only in the Project Settings.

    Creating Tags

    Assigning Tags to Tasks

    How Tags Work
    • Tags are a multi-select property

    • Archived Tags will no longer be available to add to tasks but will still exist on tasks it was assigned to before the resource was archived

    Filter by Tag

    To Filter by Tag:

    Filter Breakdown
    Filter
    Operator
    Value

    Shift

    Shifts help you show when work is planned to happen whether it’s during the day, in the afternoon, overnight, or across multiple shifts.


    Assigning a Shift to a task helps clearly communicate when the work is planned to happen.

    • On the Gantt, navigate to the column picker and toggle Shift

    • Click a cell in the column and select from Day

    Six Day

    Monday, Tuesday, Wednesday, Thursday, Friday, Saturday

    Seven Day

    Monday, Tuesday, Wednesday, Thursday, Friday, Saturday, Sunday

    The edited calendar will not be applied to any existing Tasks

    Making any changes to the start date, end date or duration of a Task will apply the updated calendar to the Task

    Save and force reschedule existing Tasks

    The edited calendar will be applied to all future planned tasks and Tasks with days in progress

    The edited calendar will not automatically be applied to any Tasks that have finished (no working days in progress or in the future)

    Any String

    "New Task"

    Start

    dd/MM/yyyy',

    'dd/MM/yy',

    'yyyy/MM/dd',

    'dd-MM-yyyy',

    'dd-MM-yy',

    'yyyy-MM-dd',

    'ddMMyy',

    'yyyyMMdd',

    Prefix of the day are also supported i.e. "Tue ddMMyyyy"

    Today

    End

    Same as Start

    Same as Start

    Shift

    'Day',

    'Afternoon',

    'Night',

    'All',

    Day

    Package

    Any String

    N/A

    Subcontractor

    Any String

    N/A

    Imported tasks will be assigned to the project's default calendar and the owner undertaking the migration.

    Tasks will be created in the plan immediately
    Sample CSV Import File

    Task Name

    Tag

    Is Is Not Is Empty Is Not Empty

    Multi-Select

    ,
    Night
    ,
    Afternoon
    or
    All

    See also: Bulk Edits


    Group by Shift gives you a simple way to lay out your plan by all the different Shifts the team is working. This is possible across all View types, but let's start by looking at Group By Shift on Board.

    • Click

    • Select Shift


    Increase visibility of Shifts by updating the task bar, card colour, or work area based on shifts assigned to Tasks.

    • Open a Gantt View

    • Click

    • Click Bar Colour and select Shift

    • Open a Board View

    • Click

    • Click Task Card Colour and select Shift

    • Open a Map View

    • Click

    • Click Work Area Colour and select Shift


    Filter by Shift to see Tasks planned for a specific time of day, perfect for coordinating teams across different shifts.

    • Click and

    • Select Shift in the first dropdown

    • Select from Is or Is Not in the second dropdown

    • Select from Day, Night, Afternoon or All in the third dropdown

    See also: create & share Views

    Who can use this feature?

    Admins, Owners and Assignees can update the Shift on a Task.

    Assigning a Shift to Tasks

    Change the shift of the Task:

    Shift types
    Option
    Meaning
    Shift Rules
    • When a task is created Day shift is automatically assigned

    • Shifts are hard coded in Aphex and new shifts cannot be created

    Group By Shift

    Group by Shift on Board:

    Colour by Shift

    Colour by Shift on Gantt:

    Colour by Shift on Board:

    Colour by Shift on Map:

    Filter by Shift

    Filter by Shift:

    Filter Breakdown
    Filter
    Operator
    Value

    Production Measures

    Production Measures let you define the measurable outputs work is planned against, each created with a name, unit (e.g. ‘Panels, each’), and an optional target rate per day. When a target rate is set, Aphex calculates the implied daily rate and compares it against that target, surfacing the variance as a red, amber, or green indicator in a dedicated Production Measure column on the Gantt.

    Creating Production Resources


    Creating Production resource lets you build a reusable library of Production to assign to Tasks.

    To create Production:

    • Click your Project Title in the top left, then select Project Assets

    • Select Production from the menu

    • Click

    • Create your custom Production resource by entering the Name, Unit and a Colour

    • Optionally assign a Unit Name and toggle Set Daily Target Rate

    • The Production resource is added to the library of Production the team can assign to their Tasks


    Assign Production to tasks and track progress throughout the task duration

    • Assign from the Gantt column and the task side panel.

    • Pick a unit-based measure to open a planning view where you can set the total quantity, review the daily breakdown and alignment, then


    Make changes to the production breakdown where needed and impact the cumulative total needed.

    • Right-click a Task and select View Details

    • Scroll to Planned Resources and click into

    • Update the value and see the cumulative total impact

    A Task's Production breakdown is locked the moment the Task is Promised, or once it has any Progress recorded. Once Confirmed, the measure, quantity and breakdown becomes read-only. To change them, delete the task's progress first or change the status to Planned.


    When a task's average production rate is below or in excess of its target, you can extend or shorten the task duration in one click so it lines up with the target rate no manual recalculating needed.

    • Hover the Target Rate Variance icon on the Production Gantt cell, in the Task side panel, or on a Board/List task card

    • Where the average is off target, an Align Task Duration button appears

    • Click it to extend or shorten the task duration until the daily average production matches the target rate


    Once a Production Measure with a target rate is assigned to a task, Aphex continuously compares the task's planned daily rate against that target so misalignment is visible before it becomes a problem.

    Resizing or dragging a task with a Production Measure assigned updates its plan in real time.

    • As you stretch or shrink the Task Bar, a Task Resize Indicator tooltip shows a live preview of the new average daily production rate

    • If the measure has a target rate set, the tooltip also shows whether that new average is aligned, above, or below target

    • Release the bar to confirm the new duration the daily breakdown recalculates automatically

    • On the Gantt, navigate to and toggle on Production

    • Check the visuals of , and to check the Target Rate Variance


    • Click and

    • Select Production in the first dropdown

    • Select from Is, Is Not, Is Empty or Is Not Empty

    See also: create & share

    Status

    Who can use this feature?

    Admins & Owners can update Task Status. This can be changed to Admin only and Admins, Owners & Assignees in the Project Permissions


    Admins can regress Task Status, this can be changed to All Members in the Project Permissions

    Task Status helps track the lifecycle of work, from planning, to commitment, to completion. It’s a simple way to bring structure and accountability to the plan.

    Updating Task Status to Promised


    Promised Tasks are commitments. If the committed dates are changed, a delay reason must be recorded in order for the update to save.

    Change Task Status to Promised:

    • On the Gantt, use the Column Picker to toggle Status

    • Click the Status cell for your task & select Promised from the dropdown menu

    See also:


    Done Tasks are those determined to have actualised start and end dates. Done Tasks are locked in place so no date changes or Progress Updates can be made.

    • On the Gantt, use the Column Picker to toggle Status

    • Click the Status cell for your task & select Done from the dropdown menu

    See also:


    Planned Tasks are those not yet promised to be delivered, and can be moved freely. This is the default state of all tasks.

    • On the Gantt, use the Column Picker to toggle Status

    • Click the Status cell for your task & select Planned from the dropdown menu


    The promised Period can be set when Publishing. The Promised Period is shown as a hatched section on the Gantt, ending with a solid purple Promised Line.

    • On the Gantt, Hover over and Click

    • A menu will appear, on the menu click

    See also:


    Filtering by Status lets you show or hide Tasks based on whether they're Planned, Promised or Done.

    Filter by Status:

    • Click and

    • Select Status in the first dropdown

    • Select from Is or Is Not in the second dropdown

    See also: create & share

    Subcontractor

    Subcontractors can be assigned to Tasks to show who’s delivering the work. They help teams organise, group, and colour Tasks by Subcontractor, making it easier to coordinate and track progress across your plan.


    Creating Subcontractors lets you build a reusable library of Subcontractors to assign to Tasks.

    • Click your Project Title in the top left, then select Project Assets

    • Select Subcontractors

    Locations

    The Location library is where you create and manage all Locations for your Project. Locations can be geolocated maps that connect to external layers like ArcGIS or drone flyovers, or static images to represent a zone, floor, or layout. Each Task can be assigned to a Location - which can then be used in filters, to group the plan, or to open Map Views.


    Pick a Location type, set a name and save it to your Project's library.

    • Click your Project Title in the top left

    • Select Project Assets

    Readying & Reviewing

    Before a plan is published, you can mark your part as Ready to signal it’s up to date and good to go. Even if you don’t mark it as ready, your tasks will still be included in the published version.


    If you own Tasks in the lookahead period, it's your responsibility to make sure they're accurate, up to date and don't have any outstanding Unresolved Issue. This means Task Owners need to be mitigating any Clashes, adding Missing Data and resolving any Overdue Blockers.

    • Click your Publishing Deadline in the top right of the page

    • This will open the Make Ready Window

    Exports

    Exporting lets you download key project data from live plans and published versions to Resources, Folders, Blockers, and Milestones.


    You can export your live plan from the Gantt, Map, Board, or List views. The export will reflect whatever filters and dates you’ve set at the time.

    To export a Live plan:

    • Open your preferred view and click

    • Select


    Applies to work scheduled later in the day. Ideal for teams running extended hours beyond the usual daytime window.

    Night

    Covers tasks planned to take place overnight. Common for work that needs to happen outside normal site hours.

    All

    Used when a task spans multiple shifts or doesn’t fit neatly into a single timeframe.

    Day

    Used for tasks planned during the daytime. Typically, for tasks within standard site hours.

    Shift

    Is Is Not

    Afternoon

    Day, Night, Afternoon, All

    The quantity breakdown updates automatically to reflect the new duration
    in the second dropdown
  • Select your desired Production measure in the third dropdown

  • Production Measure Resource rules
    • The Unit is confirmed once a measure is created; name, colour and target rate can be edited. Percentage-based measures have no quantity, target or breakdown.

    • Choosing Count adds a custom Unit Name e.g. ‘Panels’.

    Assigning to tasks

    Production on Tasks rules
    • Only one Production Measure can be assigned to a task at a time.

    Editing Planned Production

    Production Impact rules
    • Unit-based measures (m³, linear metres, items, etc.) take a total quantity, support an optional daily target rate, and show a day-by-day breakdown with on/ over/ under targetstatus.

    Align your Task Duration with the Target Rate

    Understanding Planned Production

    Understanding Task movement on Planned Production

    Target Rate Variance Summary

    Target Rate Variance meaning
    Icon
    Meaning

    Over the current target rate and could mean reforecasting is needed

    Filter by Production

    To filter by Production:

    Filter Breakdown
    Filter
    Operator
    Value

    Production

    Is Is Not Is Empty Is Not Empty

    Views

    Select from Planned, Promised or Done in the third dropdown

    How Promised Tasks Look in the Plan
    Status
    Visual

    Promised

    Start and End Date Visualisation

    Updating Task Status to Done

    Change Task Status to Done:

    How Done Tasks Look in the Plan
    Status
    Visual

    Done

    Start and End Date Visualisation

    Revert a Task Status to Planned

    Revert Task Status to Planned:

    How Planned Tasks Look in the Plan
    Status
    Visual

    Planned

    Start and End Date Visualisation

    Promised Period

    Filter by Status

    Filter Breakdown
    Filter
    Operator
    Value

    Status

    Is Is Not

    Bulk Edits
    Bulk Edits
    Set Promised Period
    Views
    from the menu
  • Click

  • Create your Subcontractor by entering a name and assign a colour

  • The Subcontractor is added to the library of Subcontractors the team can assign to their Tasks


  • Assigning a Subcontractor to a Task can show who’s responsible for the work and helps with organising and visualising your plan.

    • On the Gantt, use the column picker to toggle Subcontractor

    • Click a cell in the column and add a Subcontractor to the Task from the dropdown

    See also: Bulk Edits


    Make it easier to see which Subcontractor is responsible for an activity by changing your Task or Work Area colour according to which Subcontractor is completing the Task.

    • Open a Gantt View

    • Click

    • Click Bar Colour and select Subcontractor

    • Open a Board View

    • Click

    • Click Task Card Colour and select Subcontractor

    • Open a Map View

    • Click

    • Click Work Area Colour and select Subcontractor


    Grouping by Subcontractor arranges the Plan by who's delivering each Task. This is possible across all View types, but let's start by looking at Group By Subcontractor on Board.

    • Click

    • Select Subcontractor

    • Optionally, select a different Primary Group, and select Subcontractor as the Sub-Group


    Turn on the Resources Overlay to see how many Tasks are planned each day per Subcontractor. You’ll get a clear view of daily workload, plus a breakdown of which Tasks are contributing to it.

    • Open a Gantt View

    • Click and select

    • Click the icon on the left to view your Subcontractors

    • Hover over the numbers to view your Total and Project Utilisation

    • Click the Resources Configuration icon to switch between Tasks in View and Project Utilisation

    • Hover over the daily quantity value to see the daily breakdown


    Filter by Subcontractor to review and manage Tasks related to particular Subcontractors across your plan.

    • Click then

    • Select Subcontractor in the first dropdown

    • Select from Is, Is Not, Is Empty or Is Not Empty in the second dropdown

    • Select your desired Subcontractor in the third dropdown

    See also: create & share Views


    Once Subcontractors have been assigned to Tasks, all updates (including Delays, On Track & Improvement events) can be traced back to each Subcontractor. This makes it easy to understand how each Subcontractor is performing across the project.

    Aphex Insight gives you a live snapshot of Subcontractor performance - no set up required. Automatically see which Subcontractors are responsible for the highest shares of delay and why.

    User Power BI to build custom reporting on Subcontractor delays and performance, based on data in your weekly Published Versions. Aphex provides free templates as a starting point but everything can be customised to suit your project reporting requirements.

    See also: Connect to Power BI

    Who can use this feature?

    Task Owners, Assignees and Admins can allocate a Subcontractor to their Tasks.


    Project Admins can create and manage the library of available Subcontractors.

    Creating Subcontractors

    Creating new Subcontractors:

    How Subcontractors Work
    • Subcontractors are a single-select property

    • Subcontractor acts as a tag to show which company is delivering the work - it’s not a permission-setting field. If you want someone from that company to be able to update progress or edit the Task, add them as an Assignee or an Owner.

    Assigning Subcontractors to Tasks

    Adding Subcontractors to Tasks:

    View Tasks by Subcontractor Colour

    To colour by Subcontractor on the Gantt:

    To colour by Subcontractor on the Board:

    To colour by Subcontractor on the Map:

    Organise your plan by Subcontractor

    To Group by Subcontractor on Board:

    View Subcontractor Demand on the Gantt

    View the Resource Overlay by Subcontractor:

    What's Shown on Hover

    On hover, the daily breakdown includes:

    • # of Tasks

      • Number of Tasks in your current View assigned to that Subcontractor on the selected day (respects filters)

    Resource Overlay Configuration Options
    Option
    Function

    Filter by Subcontractor

    Filter by Subcontractor:

    Filter Breakdown
    Filter
    Operator
    Value

    Performance Breakdown by Subcontractor

    Aphex Insight

    Power BI

    Select Location from the menu

  • Click

  • Pick a Location Type; Model Space, Real World or Off Site

  • Give your Location a name and select

  • See also: open a Map View


    These are real-world Locations with coordinates - similar to Google Earth. You can switch between base maps (satellite or street), and connect external layers to give the team extra context while they’re planning.

    You can connect up to 10 external map layers to a Map Space Location. These layers come from tools like ArcGIS or drone services like Propeller, and let your team overlay context - like utilities, survey data, or design drawings - directly in the Map. Layers can be shown or hidden as needed to help mark up work areas or communicate plans more clearly.

    • Click your Project Title in the top left

    • Select Project Assets

    • Select Location from the menu

    • Click into your Map Space Location

    • Select

    • Paste in your Layer URL and click Continue

    • If required, select the correct Credential to access the layer

    • Review the Layer Summary and click to add the layer to the Location

    See also: Connect to ArcGIS

    When you connect a layer, Aphex will detect all available sublayers. Layer Policies help you control which ones are brought into your project - and whether they stay synced automatically or not.

    • Open the Configure Location Layer menu

    • Click into the Layer Policy dropdown

    • Make a selection from: Most Recent, Change Over Time, All Layers or Custom Selection

      • If you select Custom, use the checkboxes to manually pick sublayers

      • If you select Most Recent, define the Layer Quantity

    • Click to add the layer to your Location

    • The selected policy will apply to both existing and future sublayers

    These policies & selected Sublayers can be changed at any time.


    Model Space Locations use a single uploaded image, like a site GA, floor plan, or layout export as the base for marking up Work Areas.

    • Click your Project Title in the top left

    • Select Project Assets

    • Select Location from the menu

    • Click into your Map Space Location

    • Select

    • Select the file you want to upload

    • Select to add the image to the Location

    • Locate the Location you'd like to replace

    • Hover the Image layer and click ...

    • Select Replace File

    • Upload your replacement image and confirm


    Off Site Locations are simple placeholders for areas that aren't part of the site map. They're helpful for tagging work that happens elsewhere (like a precast yard) without need for a visual representation.

    Off Site Locations cannot be opened in a Map View, and no Work Areas can be marked up on them.


    Archiving a Location removes it from active use - it can't be opened in Map View or assigned to Tasks. The data is still part of the project's history and you can restore it at any time if you need to bring it back.

    • Locate the Location you'd like to replace

    • Hover the Image layer and click ...

    • Select Archive


    Each Task can be assigned to a Location from your Project's library - the first step in showing that Task on the Map.

    To assign a Location:

    • On the Gantt, use the Column Picker to enable the Location column

    • Click the Location cell for your Task and choose a Location from the dropdown

    See also: mark up a Work Area


    Group Tasks by Location to organise your plan by where work is happening. It's possible in all View Types, but let's first take a look at grouping by Location on the Gantt:

    • Open a Gantt View

    • Click the menu in the top left

    • Select Location as the primary grouping

    • Tasks will be arranged into groups based on their assigned Location

    • Use the ⋮⋮ to drag and reorder groups as needed


    Filter by Location to focus on Tasks happening in a specific area or zone.

    • Click and

    • Select Location in the first dropdown

    • Select from Is, Is Not, Is Empty in the second dropdown

    • Select your desired Location in the third dropdown

    See also: create & share Views

    Who can use this feature?

    All Project Users can allocate a Location to their Tasks.


    Project Admins can create and manage the Library of available Locations and External Map Layers.

    Creating a Location

    To create a Location:

    Map Space Locations

    Add External Map Layers

    To add a Map Layer:

    Layer Policies

    Set a Layer Policy

    Layer Policy Definitions & Behaviour

    Most Recent*

    • Automatically updates with your most recent sublayers - choose up to 3

    Change Over Time*

    • Automatically updates to include your newest, median and oldest sublayers

    Model Space (Drawing) Locations

    Uploading a Location Image

    Replacing a Location Image

    Be careful when replacing the Location Image

    Image replacements must match the original dimensions exactly. Work Areas are fixed to points on the image, if the scale or aspect ratio changes, Tasks risk being misaligned and may need to be redrawn.

    Supported Model Space File Types
    • PDF, JPEG (JPG), and PNG are the accepted file types for uploading images to Model Space (drawing) locations

    Off Site Locations

    Archiving a Location

    To archive a Location:

    Assigning a Location to your Tasks

    Group by Location

    Group by Location on the Gantt:

    Filter by Location

    To set a Location Filter:

  • You'll see a count of all your Clashes, Missing Data and Overdue Blockers

  • Click any of the counts to open the relevant panel and start resolving issues


  • The Missing Data Panel highlights tasks you own that are missing required info, based on the lookahead set in the publishing schedule.

    Open the Missing Data panel:

    • Open the Gantt

    • Towards the right-hand side, select

    • This will open the Missing Data Panel

    • Click into any Task Name in this panel to automatically open the specific columns you need to complete


    The Blockers Panel highlights Open and Overdue Blockers, with Overdue ones always visible even if they fall outside the lookahead window so nothing critical gets missed.

    Open the Blockers Panel:

    • Open the Gantt

    • Towards the right-hand side, select

    • This will open the Blockers Panel

    • Click the next to the Blocker to Resolve it

    See also: Blockers


    The Clashes Panel shows Tasks in your lookahead that share the same work area, helping you spot and resolve scheduling conflicts.

    Open the Clashes panel:

    • Open the Gantt

    • Towards the right-hand side, select

    • This will open the Clashes Panel

    • Click any Task Name in the panel to see which Task it’s clashing with, and who owns it.

    See also: Clashes


    Filtering by Issue lets you focus on specific Tasks based on what issues they have. It’s a quick way to review and manage work related to a particular issue across your plan.

    • Click and

    • Select Issue in the first dropdown

    • Select from Is, Is Not, Is Empty or Is Not Empty in the second dropdown

    • Select your from Clashes, Overdue Blockers or Missing Data in the third dropdown

    Your Project comes with a pre-made Unresolved Issues View.

    • Click + Views within the open View Tabs

    • Select Unresolved Issues View

    See also: create & share Views


    Marking your part of the plan as Ready lets your team know your Tasks are up to date and good to go for publishing.

    How to Make Ready:

    • Click your Publishing Deadline in the top right of the page

    • This will open the Make Ready Window

    • Select

    • Additionally, if you’re confident in your plan, you can still choose to Make Ready even if some issues haven’t been resolved.

      • Select Make Ready with Issues

    See also: Publishing


    You can assign a Reviewer to any User, ideal for reviewing Subcontractor's plans, or if someone on the Project is away. Reviewers are notified when plans are Ready and can either approve them or mark them Ready on the User’s behalf.

    • Click your Project Title in the top left then select Users

    • Find the user you want to assign a Reviewer to

    • Click the + in the Reviewer column

    • Select the User you'd like to set as the Reviewer

    • Click the 0/X Reviewed button in the top right of the page

    • Find the Work for Review section in the menu that opens

    • Use the to view each User's plan

    • Tick off their plan once you're ready to mark it as Reviewed

    See also: Plan Reviewer

    Who can use this feature?

    Task Owners can make their part of the plan Ready


    Reviewers and Admins can approve plans on behalf of other Task Owners.

    Unresolved Issues

    To see unresolved issues in your Plan:

    Issue definitions
    Issue
    Meaning

    Missing Data Panel

    Blockers Panel

    Clashes Panel

    Filter by Unresolved Issue

    Filter by Issue:

    Pre-made Unresolved Issues View:

    Filter Breakdown
    Filter
    Operator
    Value

    Make Ready

    Make Ready Rules
    • If you make changes to the plan after marking it as ready, it will automatically be un-readied.

    • You can only Ready Tasks that you own, and that fall within the Project’s Lookahead Period.

    Reviewing Plans

    To set a Reviewer:

    To mark Plans as Reviewed:

    Exporting a published version lets you download plan data exactly as it was at the moment it was published. The export will reflect whatever filters and dates you’ve set at the time.

    To export a Published version of a plan:

    • Open any Published version and Click

    • Select Export Tasks to CSV

    See also: Publishing


    Export the Resource Overlay to get a daily breakdown of Labour, Plant, Materials, or Subcontractors based on your current view and filters.

    To export Resources:

    • Navigate to the Gantt view and select

    • Click and select the desired resource

    • Select and click

    See also: Resource Overlay


    Exporting a project’s folder structure creates a CSV file with each Folder’s name and code, making it easy to review or reuse your Folder setup.

    To export Folders:

    • Click your project title in the top left

    • Select Project Assets

    • Open the Folders page from the menu

    • Select

    See also: Folders


    You can export Blockers from the live Gantt, and the file will match whatever filters and dates you’ve set at the time.

    To export Blockers:

    • Navigate to the right-side of the Gantt and click

    • Click the configuration icon and select

    See also: Blockers


    You can export Milestones from the live Gantt, and the export will reflect the filters and date range you’ve set at the time.

    To export Milestones:

    • Navigate to the right-side of the Gantt and click

    • Click the configuration icon and click

    See also: Milestones


    You can export Clashes from the live Gantt and Map, and the export will reflect the filters and date range you’ve set at the time.

    To export:

    • Navigate to the right-side and click

    • Click in the top-right of the Clashing Tasks panel

    • Click

    See also: Clashes

    Who can use this feature? All Project users can export Project data.

    Exporting Live Plans

    Exporting Live Plans Rules
    • Data included in the file is defined by the Filters and Dates set at the time of the export.

    • The export includes three files: one for Tasks, one for Progress Updates and one for Folders

    Exporting Published Versions

    Exporting Published Versions Rules
    • Data included in the file is defined by the Filters and Dates set at the time of the export.

    • The export includes three files: one for Tasks, one for Progress Updates and one for Folders

    Exporting Resources

    Resource Utilisation Tool
    Option
    Meaning
    Exporting Resources Rules
    • Data included in the file is defined by the Filters and Dates set at the time of the export.

    • The export includes two files: one for Total Task Utilisation and one for Total Project utilisation.

    Exporting Folders

    Exporting Folders Rules
    • A Folders CSV will be downloaded

    Exporting Blockers

    Exporting Blockers rules
    • Data included in the file is defined by the Filters and Dates set at the time of the export.

    • A Blockers CSV is downloaded

    Exporting Milestones

    Exporting Milestones Rules
    • Data included in the file is defined by the Filters and Dates set at the time of the export.

    • A Milestone CSV is downloaded

    Exporting Clashes

    Exporting Clashes rules
    • A ZIP file downloads containing three CSVs, one for each tab

    • All active filter values are applied consistently across all three files

    • If a Task clashes with multiple other Tasks, it appears on a separate row for each clash partner

    Labour & Plant

    Who can use this feature?

    All project users can add Labour and Plant to their Tasks.


    Project Admins can create new Labour and Plant resources.

    Labour and Plant can be added to Tasks to track and forecast your daily resource demand.

    Create Labour Resource


    Creating Labour resource lets you build a reusable library of Labour to assign to Tasks.

    To create Labour:

    • Click your Project Title in the top left, then select Project Assets

    • Select Labour from the menu

    • Click

    • Create your custom Labour resource by entering the Name, Labour Type and a Colour

    • The Labour resource is added to the library of Labour the team can assign to their Tasks


    Creating Plant resource lets you build a reusable library of Plant to assign to Tasks.

    • Click your Project Title in the top left, then select Project Assets

    • Select Plant from the menu

    • Click


    You can assign as many Labour resources to each Task as you need. Once added to the task, they’re assumed to be needed for the entire working duration - keeping things simple and helping teams plan ahead.

    • On the Gantt, navigate to the column picker and toggle Labour

    • Click the Labour cell for your Task & select the relevant Labour option from the dropdown menu

    • Use the + / - buttons to increase or decrease the Labour quantity needed for the duration of the Task

    See also:


    You can assign as many Plant resources to each Task as you need. Once added, they’re assumed to be needed for the entire working duration - keeping things simple and helping teams plan ahead.

    • On the Gantt, navigate to the column picker and toggle Plant

    • Click the Plant cell for your Task & select the relevant Plant option from the dropdown menu

    • Use the + / - buttons to increase or decrease the Plant quantity needed for the duration of the Task

    See also:


    Use the Resource Overlay in the Gantt to forecast Labour & Plant demand day by day. You'll see how much of each Labour or Plant is needed across the project, with a clear breakdown of which Tasks are driving that usage and who's using it.

    • Click and select Resources

    • Use the icons on the left to view Labour

    • Hover over the numbers to view your Total and Project Utilisation

    • Click and select Resources

    • Use the icons on the left to view Plant

    • Hover over the numbers to view your Total and Project Utilisation

    See also:


    Filter by Labour to quickly review and manage work related to a particular Labour item across your plan.

    • Click and

    • Select Labour in the first dropdown

    • Select from Is, Is Not, Is Empty, Is Not Empty


    Filter by Plant to quickly review and manage work related to a particular Plant item across your plan.

    • Click and

    • Select Plant in the first dropdown

    • Select from Is, Is Not, Is Empty, Is Not Empty

    See also: create & share


    Connect your Project as a datasource for Power BI to report on Labour & Plant Demand.

    Utilise Aphex Insight to track Labour & Plant Resource Demand. See trends and drill down into specific Tasks to identify where each Labour and Plant Resource is allocated.

    See also:

    Blockers

    Who can use this feature?

    Task Owners, Assignees and Admins can add Blockers to their Tasks, and Resolve Blockers.


    All Project members can Create & Manage the Blockers Library by default. This can be changed to Admins only in the Project Settings.

    Blockers help you surface, monitor & resolve anything that needs to happen before a Task can start (or finish). Use them to stay on top of permits and sign-offs to stop delays before they occur. Add due dates, get visibility on what’s overdue, and tick things off once they’re sorted.

    Creating Blockers


    Set up a library of Blockers that can be used across the Project. Give each Blocker a name, category, and an optional due date rule so deadlines stay in sync automatically as the plan evolves.

    To create a new Blocker type

    • Click your Project Title in the top left, then select Project Assets

    • Select Blockers from the menu

    • Click

    • Configure your Blocker by entering a name, selecting a category, choosing a colour & setting an optional Automated Due Date

    • The Blocker is added to the library of Blockers the team can assign to their Tasks


    One or more Blockers can be assigned to a Task at any time.

    To assign Blockers:

    • On the Gantt, use the Column Picker to enable the Blockers column

    • Click the Blocker cell for your Task and choose a Blocker type from the dropdown

    • The Blocker will be added to the Task with a status of Open or Overdue depending on its Due Date settings

    To override or reset the Due Date:

    • On the Gantt, use the Column Picker to enable the Blockers column

    • Click into the Blocker cell

    • Select the ... next to the relevant Blocker

    See also:


    Overdue Blockers are the early warning signs of delay. Whether you're clearing your own list or reviewing risk across the plan, it's easy to surface overdue Blockers and get ahead of what's slipping.

    To see Overdue Blockers from the Gantt:

    • On the Gantt, open the menu in the top right

    • Toggle Show Overdue Blockers

    • Task Bars with Overdue Blockers will now be marked with an next to them

    • Click the icon to open the Blockers Panel

    • A list of all Overdue Blockers and associated Tasks will appear

    Overdue Blockers form part of an owner’s Unresolved Issues - items they need to clear before Making Ready, ahead of the weekly Published Version deadline.

    See also:


    Mark a Blocker as Resolved so your team knows that it has been actioned.

    • Navigate to the Blocker Task Cell or double click on the Task Gantt bar to open it

    • Click the next to the Blocker to Resolve it

    • A date stamp is added to the Task history to indicate when it was marked as Resolved


    The Blockers Panel gives you a focused view of everything that’s overdue or upcoming. Filter to see just your own Blockers or the full Project list. You’ll see due dates, task names, and a live view of anything at risk of causing delays - with quick access to resolve things as they’re sorted.

    • Open the right hand panel

    • Click the icon to open the Blockers Panel

    • Blockers will be listed and grouped by Blocker Type

    • Click the to resolve a Blocker directly from the list

    See also:


    Switch to Summary Mode to get a traffic-light view of each Task. Strip all the Blocker information back to just see a quick count of Blockers, colour coded by status.

    Turn on Summarise Blockers from Board:

    • On Board, open the menu

    • Locate Blockers and select the >

    • Toggle Summarise Blockers

    Turn on Summarise Blockers from the Gantt:

    • On the Gantt, use the Column Picker to enable the Blockers column

    • Hover over the column name & click the ...

    • Toggle Summarise Blockers


    Filter by Blocker type to focus on Tasks needing a specific permit or sign-off, or by Blocker Status to see what’s still Open, Overdue, or Resolved.

    • Click and

    • Select Blockers in the first dropdown

    • Select from Is, Is Not, Is Empty or Is Not Empty

    To Filter by Blocker Status:

    • Click and

    • Select Blocker Status in the first dropdown

    • Select from Is or Is Not

    See also: create & share

    Owner, Assignee & Teams

    Who can use this feature?

    Task Owners, Assignees and Admins can edit Task Assignees.


    Task Owners and Admins can update Task Ownership.


    All project users can create Teams.

    Every Task in Aphex has an Owner: the person ultimately accountable for that scope of work. Owners can add Assignees to help update and progress the Task.

    Teams are collections of Tasks Owners you can use as quick filters, making it easy to see work owned by a specific group of Users.

    Updating Task Ownership


    Every Task will always have an Owner, but Ownership can be changed at any time. You can reassign Tasks individually or in bulk to reflect who’s now responsible.

    To change Task Ownership:

    • Open the column picker and toggle Owner

    • Click into the Owner cell

    • Select a different user from the dropdown

    Need to give another user the same permission as the Owner so that User A can always edit User B's tasks? Set up Owner Delegates.

    See also: and and


    Assignees are collaborators on a Task. You can Assign one or more people to help update the Task - they’ll then see it in their daily Task List, can report progress, and make edits if needed.

    • Open the column picker and toggle Assignee

    • Click into the + Assignee cell

    • Select all the users you want to set as Assignees

    See also: and and


    Create a Team to group Task Owners for quick filtering. A team can be used in filters like “Owner = Civils Team” to show related work.

    • Click your Project Title in the top left and select Users

    • Select Teams from the menu

    • Click


    You can filter any View by who Owns the Task, who's been Assigned to it, or which Team they're part of. It's a simple way to focus on just your scope, or keep track of work across different roles.

    • Click and

    • Select Owner in the first dropdown

    • Select from Is or Is Not in the second dropdown

    • Click and

    • Select Assignee in the first dropdown

    • Select from Is , Is Not, Is Empty or Is Not Empty

    See also: create & share


    Grouping by Owner arranges the Plan by the person responsible for each Task. This is possible across all View types, but let's start by looking at Group By Owner on the Gantt:

    • Open a Gantt View

    • Click

    • Select Owner

    • Optionally, select a different Primary Group, and select Owner


    Grouping by Assignee organises your Board by the person(s) each task is assigned to, so you can quickly see who’s working on what (and what’s still unassigned):

    • Open a Board View

    • Click

    • Select Assignee

    • Optionally, select a different Primary Group, and select Assignee


    Make it easier to see which Owner is responsible for an activity by changing your Task or Work Area colour according to which Owner is completing the Task

    • Open a Board View

    • Click

    • Click Task Card Colour and select Owner

    • Open a Gantt View

    • Click

    • Click Bar Colour and select Owner

    • Open a Map View

    • Click

    • Click Work Area Colour and select Owner


    Because every Task has a clear Owner, it's easy to track how each person is performing across the Project - not just in terms of delays, but also how consistently they're keeping their part of the plan up to date.

    Aphex Insight gives you a live snapshot of Owner performance - no set up required. Automatically see which Owners are responsible for the highest shares of delay and why.

    User Power BI to build custom reporting on Owner delays and performance, based on data in your weekly Published Versions. Aphex provides free templates as a starting point but everything can be customised to suit your project reporting requirements.

    See also:

    Packages

    Who can use this feature?

    All project users can create & own Packages.


    Project Admins can edit and archive Packages.

    Packages give you a flexible way to organise your Tasks without changing the project’s core structure. While the Folder tree typically remains the shared backbone of the plan, Packages let anyone group Tasks by whatever makes the most sense for delivery: zones, trades, phases, disciplines - you decide.

    They’re easy for anyone to create, drag into a custom order, and use to shape views that are more practical for how you plan and build.

    Creating Packages


    Packages can be created at any time while planning. Just give it a name and you're ready to start grouping Tasks in a way that works for you.

    To create a Package from the Gantt:

    • Make sure that your is set to Package

    • An option to Create Package will appear on the Gantt

    • Click this and give your new Package a name


    Once your Packages are set up, it's easy to start using them. Add new Tasks straight into a Package, or update existing Tasks to move them into the right Package.

    • On the Gantt, open the column picker and toggle Package

    • Click the Package cell for your task & select a Package from the dropdown menu

    • Alternatively, use drag and drop to move a Task into a Package

    See also:


    Group by Package gives you a simple way to lay out your plan around the Packages you're using. This is possible across all View types, but let's start by looking at Group By Package on the Board.

    • Open a Board View

    • Click

    • Select Package

    • Optionally, select a different Primary Group, and select Package

    Packages are flat and do not allow for sub-packages to be created. If you need more hierarchy, it's best to use Subfolders to build out your plan.


    Change the order of Packages in your Plan by dragging and dropping them.

    • Hover over the Package you want to move

    • Use ⋮⋮ to drag your Packages in the order in which you want them to be displayed

    • Drop the Package to a new location


    Apply a Package filter to see only the Tasks sitting in specific Packages in your Project .

    • Click and

    • Select Package in the first dropdown

    • Select from Is, Is Not, Is Empty or Is Not Empty

    See also: create & share

    Milestones

    Who can use this feature

    All Project users can convert a Task to a Milestone.


    Task Owners, Assignees and Admins can edit the Milestone Target Date.

    Milestones mark critical points in your project, from contract deliverables to site handovers. In Aphex, they work just like Tasks, so you can assign all the same details: like Owners, Resources, Subcontractors, Blockers, Work Areas, and Delays.

    Milestones can include a fixed Target Date, giving you a reference point to track progress against. The Gantt will summarise & highlight whether you're on track or slipping, across all your Milestones.

    Creating Milestones


    To create a Milestone, convert any existing Task or Subtask, or import Milestones directly from your Master Schedule.

    Create a Milestone from the Gantt:

    • Hover over the task name

    • Click and select Convert to Milestone


    Each Milestone can be assigned a Target Date: the original or ideal date you’re aiming for, often pulled from a Master or Contract Schedule. The Target Date marker changes colour based on performance, helping you see at a glance how things are progressing against the plan.

    • Right click a Milestone and select View Details

    • In the Task Panel that opens, locate the Target Date section

    • Toggle Set Target Date

    • If your Milestone has slipped the Target Date marker will appear as

    • If your Milestone is on track, Target Date marker will appear as

    • Use the +/- indicators to see how many days a Milestone is ahead or behind


    Use the Milestone Panel to compare current Milestone Dates to Target Dates, or pervious Weekly Versions to see how things have shifted over time - and spot the impact of today's changes on future Milestones, even if they're outside of your View.

    • On the Gantt, select the Milestone Icon in the right-hand panel

    • This opens the Milestone Panel, showing Milestones across the Project

    • Click the ⌄ next to any Milestone to expand its history and see how it’s changed over time

    • In the Milestones Panel, click into the Compare To dropdown

    • Select Target Date

    • Instantly see how many days ahead/behind for each Milestone, compared to their Target Dates

    • In the Milestones Panel, click into the Compare To dropdown

    • Select Previously Published Version

    • Instantly view the variance between current and baseline dates

    See also:


    Turn on the Critical Path Overlay to highlight the short term path to any Milestone. The critical path will light up in gold, and everything else fades to blue - so it's easy to see what's critical and what's not. You can view paths for all Milestones or focus on one at a time.

    To turn on the Critical Path

    • Open the Gantt and click

    • Select Critical Path to highlight all Milestone paths in gold

    • Or click the > to choose specific Milestone pathways to highlight individually


    • Click and

    • Select Milestone in the first dropdown

    • Select from Is True or Is False in the second dropdown

    Your Project comes with a pre-made Upcoming Milestones View.

    • Click + Views within the open View Tabs

    • Select Upcoming Milestones View

    See also: creating & sharing

    Publishing

    Publishing takes a snapshot of your plan at a specific moment. It’s great for sharing, keeping the team aligned, or using as a baseline to compare progress.


    Creating a publication routine lets you set recurring deadlines for task updates, helping keep the whole project team aligned and on track.

    Setup a Publishing Routine:

    • Click your Project Title in the top left and select Publishing

    Clashes & Work Area

    Work Areas let you define the physical space each Task needs to take place. Once a Task is assigned to a Location, you can draw its Work Area on the map. That shape stays linked to the Task and automatically updates as dates change - helping you communicate exactly where work is planned to happen.

    Clashes are triggered when two tasks are scheduled to use the same space at the same time. If their Work Areas overlap and their dates intersect, a Clash is flagged - giving teams a chance to coordinate early and avoid planning conflicts on site.


    To create a Work Area, open a Task and draw the shape directly on the Map.

    • On the Map, click the work area cell

    Tasks can be coloured by or grouped by Subcontractor across all View types
  • Archived Subcontractors will no longer be available to add to tasks but will still exist on tasks it was assigned to before the resource was archived

  • # no of Project Tasks

    • Number of Project-wide Tasks using assigned to that Subcontractor on the selected day (ignores filters)

  • Task Owner Breakdown

    • Lists each Task Owner contributing to Project usage

    • Includes Task Count and percentage of total utilisation for that day

  • Cell shading

    • Darker = higher quantity

    • Lighter - lower quantity

    • Scale is relative to the values shown in the current overlay

  • Quantity values are only shown in Day View

    • In Week, Month or Year mode, cell shading remains but numeric values are hidden

  • The demand for your entire project

    Hide Un-utilised resources

    Removes resources that aren’t assigned to any Tasks from the resource list

    Total

    The demand for tasks in your current view

    Subcontractor

    Is Is Not Is Empty Is Not Empty

    Project Utilisation

    Multi-Select

    Any overdue Blockers within the lookahead period

    Missing Data

    Any tasks missing Publication Requirements set on the publication routine that are within the lookahead period

    Clashes

    Any unresolved clashes within the lookahead period

    Issue

    Is Is Not Is Empty Is Not Empty

    Blockers

    Multi-Select

    The daily allocation of the Resource

  • For Non-Conflicting rows, Overlap Start, Overlap End and Overlap Duration are left blank

  • Group By and Overlay Property are UI-only and do not affect the CSV structure

  • Each CSV includes: Task Name, Activity ID, External ID, Owner, Owner Email, Start Date, End Date, Duration, Location, Folder, Subcontractor, and the matching fields for the clashing Task, plus Clash Status, Overlap Start, Overlap End and Overlap Duration.

  • Total Task Utilisation

    The number of Tasks that have the Resource assigned per day

    Total Project Utilisation

    Create your custom Plant resource by entering the Name, Plant Type and Colour
  • The Plant resource is added to the library of Plant the team can assign to their Tasks

  • Click to filter to either Crew or Individual Resource
  • Click the Resources Configuration icon to switch between Tasks in View and Project Utilisation

  • Hover over to see the daily breakdown

  • Click to filter to a specific Plant Type

  • Click the Resources Configuration icon to switch between Tasks in View and Project Utilisation

  • Hover over to see the daily breakdown

  • in the second dropdown
  • Select your desired Labour item in the third dropdown

  • in the second dropdown
  • Select your desired Plant item in the third dropdown

  • Labour Types
    Labour Types

    Individual Resource

    Crew

    Create Plant Resource

    To create Plant:

    Plant Type
    Plant Types

    Access Equipment

    Backhoe

    Assign Labour Resources to Tasks

    To add Labour to a Task:

    Assign Plant Resources to Tasks

    To add Plant to a Task:

    Plant & Labour Property Rules
    • Labour & Plant are multi-select properties

      • You can assign multiple types of labour or plant to each Task

      • Each assigned item can have its own quantity

    • Quantities are applied per day

      • A quantity of 5 means 5 units are required for each day of the Task's duration

      • Quantities cannot vary across the days of a Task

    • Archived Labour & Plant resources will no longer be available to add to Tasks but will still exist on tasks it was assigned to before the resource was archived

    View Forecasted Resources on the Gantt

    To turn on the Labour Resource Overlay

    To turn on the Plant Resource Overlay

    What's Shown on Hover

    On hover, the daily breakdown includes:

    • Utilisation

      • Quantity of Material used by Tasks in your current View (respects filters)

    • # no of Tasks

      • Number of Tasks in your current View using that Material on the selected day (respects filters)

    • Project Utilisation

      • Total quantity used across the entire project (ignores filters)

    • # no of Project Tasks

      • Number of Project-wide Tasks using that material on the selected day (ignores filters)

    • Task Owner Breakdown

      • Lists each Task Owner contributing to Project usage

      • Includes Task Count and percentage of total utilisation for that day and Material

    • Cell shading

      • Darker = higher quantity

      • Lighter - lower quantity

      • Scale is relative to the values shown in the current overlay

    • Quantity values are only shown in Day View

      • In Week, Month or Year mode, cell shading remains but numeric values are hidden

    Resource Overlay Configuration Options
    Option
    Function

    Total

    The demand for tasks in your current view

    Filter by Labour

    Filter by Labour:

    Filter by Plant

    To filter by Plant:

    Filter Breakdown
    Filter
    Operator
    Value

    Labour

    Is Is Not Is Empty Is Not Empty

    Report on Labour and Plant Demand

    Power BI

    Aphex Insight

    Bulk Edits
    Bulk Edits
    Export Resource Demand
    Views
    Connect to Power BI
    Select Set Due Date
  • Pick a new Due Date from the calendar, or select Reset Due Date to re-apply the Blocker Due Date rule to the Task

  • Use the to choose which Blockers to display

  • Change the Owner dropdown from My Tasks to All Tasks to view Blockers across the entire project

  • Toggle Overdue Blockers only on or off to switch between seeing just overdue Blockers or all open and overdue Blockers for Tasks in your current view

  • See the Blockers Summary for each Task

    See the Blockers Summary for each Task

  • Select your desired Blocker Type in the third dropdown

  • Pick from Open, Overdue or Resolved in the third dropdown

    Blocker Categories

    Blockers can be assigned to a category that aligns with their type:

    Blocker Type

    Design

    Due Date Rules
    • If a Blocker Asset has a Due Date rule set, the Blocker’s Due Date will be applied automatically when added to a Task, based on the Task’s start or end date.

    • You can edit or remove the Due Date at any time.

    • Overriding the Due Date will lock it to a specific date. It will no longer update automatically if the Task’s dates change.

    • Resetting the Due Date will restore the dynamic behaviour: updating automatically based on the Task’s dates and the original Due Date rule.

    Assigning Blockers to Tasks

    Blocker Status

    Blockers always hold 1 status out of Open, Overdue or Resolved.

    Blocker Status
    Description

    Open

    The Blocker has a Due Date that lies anywhere from Today and into the future. Blockers without Due Dates also hold the Status of Open

    Finding Overdue Blockers

    To see a list of all Overdue Blockers:

    Resolving Blockers

    To Resolve a Blocker:

    View all Blocker information

    To open the Blockers Panel:

    Blocker Summary

    Summary Icon meanings
    • Open Blockers appear orange

    • Overdue Blockers appear red with an exclamation point

    • Resolved Blockers appear green with a tick & the text struck through

    Filter by Blocker

    To set a Blocker Filter:

    Filter Breakdown
    Filter
    Operator
    Value

    Blockers

    Is Is Not Is Empty Is Not Empty

    Bulk Edits
    Make Ready
    Export Blockers
    Views
    Pick the Team Members and name your Team
  • Click Create Team

  • Select from Me, any combination of specific Users, or any Team on the project

    in the second dropdown
  • Select from Me, any combination of specific Users, or any Team on the project

  • as the Sub-Group
    as the Sub-Group
    How Task Ownership Works
    • Every Task must have an Owner - and can only have one Owner at all times.

    • The person who creates the Task is automatically set as the Owner.

    • Ownership can be reassigned to any other User on the Project at any time.

    • The Owner has full permissions on the Task. They can edit, delete update progress, resolve clashes and mark it as Ready.

    • As the Owner, you're accountable for making sure your Tasks meet the standards for being included in the next Published Version.

    • By default, Task Bar colour is tied to it's Owner's user colour, unless custom colouring has been applied to your View

    • Tasks can be grouped by Owner across all View types

    Adding Task Assignees

    To add Task Assignees:

    How Assignees Work
    • You can add as many Assignees to a Task as needed - there's no limit.

    • Assignees can edit most properties of a Task, including updating Progress.

    • Assignees can't delete a Task, change the Owner, breakdown a Task, Make Ready or mark clashes as non-conflicting.

    • Adding someone as an Assignee also adds that Task to their daily Task List.

    • You can assign someone to a Parent Task or Package. They're automatically assigned to all Tasks underneath.

    Creating a Team

    To create a Team:

    How Teams Work
    • Teams are a collection of Users - you can make as many as you need.

    • Teams are used to filter Tasks or share Views

    • Teams don't affect Task Permission - they're for filtering and sharing Views only.

    • Adding someone to a Team won't let them edit more Tasks

    Filter by Owner, Assignee or Team

    To set an Owner Filter:

    To set an Assignee Filter:

    Filter Breakdown
    Filter
    Operator
    Value

    Owner

    Is Is Not

    Group By Owner

    To Group By Owner on the Gantt:

    Group By Assignee

    To Group By Assignee on the Board:

    Colour by Owner

    To colour by Owner on the Board:

    To colour by Owner on the Gantt:

    To colour by Owner on the Map:

    Performance Breakdown by Owner

    Aphex Insight

    Power BI

    Bulk Edits
    Task Delegates
    Task Permissions
    Bulk Edits
    Task Delegates
    Task Permissions
    Views
    Connect to Power BI
    as the Sub-Group
    in the second dropdown
  • Select your desired Package in the third dropdown

  • How Packages Work
    • Once a Package is created, it becomes available to everyone on the Project

    • Any user can assign their Tasks to an existing Package

    • A Task can only belong to one Package at a time

    • Packages are seperate from the Folder structure - assigning a Package does not change where the Task sits in the WBS

    • Each Package has a Name and an automagically generated Code to help distinguish between similarly named Packages

    • Archived Packages will no longer be available to add to tasks but will still exist on tasks it was assigned to before the Package was archived

    Adding Tasks into a Package

    Move existing Tasks into a Package:

    Package Properties
    Property
    Description

    Name

    Descriptive name given to the Package

    Group By Package

    To Group By Package on the Board:

    Reorder Packages

    To reorder Packages:

    Package Order Behaviour
    • The Package order is unique to each user, so moving them has no impact on how other users view them in the plan

    • For each View, you have have a custom Package order

    Filter by Package

    To filter by Package:

    Filter Breakdown
    Filter
    Operator
    Value

    Package

    Is Is Not Is Empty Is Not Empty

    Bulk Edits
    Views

    Pick the date

    Open the config menu to toggle filters for delayed or improved Milestones

    Milestone Conversion Logic
    • Each Milestone spans at least one day, just like every Task in your plan.

    • Only Tasks and Subtasks can be converted to Milestones

    • When converted, the Milestone keeps all its original Task properties, including duration, delay history, owner, and assigned resources

    • Attempting to set the Duration to 0 will also trigger the Convert to Milestone flow

    • You can convert a Milestone back into a Task or Subtask at any time

    Milestone Target Dates

    To set a Target Date:

    To See Target Date Variance on the Gantt:

    Target Date Logic
    • Target Dates will show green if:

      • The Milestone End Date matches the Target Date

      • The Milestone End Date is before the Target Date

    • Target Dates will show red if:

      • The Milestone End Date is after the Target Date

    • On the Gantt, a Variance Number will show how many days the Milestone has slipped or improved by

    • Target Date Icons & Variance update in real time as changes are made to the plan

    Tracking Milestone Performance

    Open the Milestone Panel:

    Target Date Comparison:

    Baseline Comparison:

    Configuring the Milestone Panel

    Date Range: Controls which Milestones appear in the list. You can show only those within your current Gantt view, all future Milestones, or every Milestone in the project. Group By: Organises your Milestones into sections. Choosing Performance vs Target splits them into four groups based on how the Milestone's end date compares to its Target Date:

    • Approaching Target: the end date is before the Target Date

    • On Target: the end date matches the Target Date exactly

    • Behind Target: the end date has passed the Target Date

    • No Target: no Target Date has been set

    You can also group by Owner, Subcontractor, Folder, or Package. Sort By: Controls the order Milestones appear within each group. Sort by date or variance, in ascending or descending order. Spotlight Milestones with Variance: When toggled on, this highlights Milestones that have slipped or improved. You can choose to spotlight just slippage, just improvements, or both. Your configuration is saved automatically per user, so the panel will remember your preferences next time.

    Critical Path Overlay

    Filter to Milestones

    To set a Milestone filter:

    Pre-made Milestones View:

    Filter Breakdown
    Filter
    Operator
    Value

    Milestones

    Is True Is False

    Export Milestone Data
    Views
    All Layers
    • Includes all sublayers and automatically connects to new sublayers

    Custom Selection

    • Choose which sublayers you want included - selected sublayers will update automatically, but new sublayers require manual selection

    *Temporal order is inferred from the layer order (bottom = oldest, top = newest) as dates aren’t always available

    Sublayers that were not successfully connected will display a icon next to the sublayer name - please check your source Layer service for more information.

    Click the settings icon in the top right
  • Configure the Publishing Routine by setting a Lookahead Period, Publication Frequency, and Publication Requirements


  • Before publishing, check that your team has updated their part of the plan and that there are no outstanding issues. When you're ready, just hit ‘Publish’, you can do this anytime, even if some team members haven’t marked their work as ready.

    Check the Plan:

    • Click your Project Title in the top left and select Publishing

    • Click into the Next Scheduled Publication

    • Check the user table to see if the team have readied/reviewed their plan, if they have any Clashes, Overdue Blockers or Missing Data

    • Decide if you're happy to Publish or if more updates are needed first

    See also: Make Ready


    Once you're happy with the plan, Publishing takes a snapshot of it at that exact moment in time. Published Versions are shared with everyone on the project and stored as a historical record - capturing how the plan looked, week by week.

    How to Publish the Plan:

    • Click your Project Title in the top left and select Publishing

    • Click into the next scheduled publication

    • Select Publish in the top right

    • A menu will appear with a summary of the data you're about to Publish

    • Select when you're ready to create the weekly version


    During the Publishing process, Automations let you optionally set historic tasks to ‘Done’, locking them in place or mark Tasks within a set window as ‘Promised’. A Promised Line will appear on the Gantt to show where commitments end, helping track delays and their impacts.

    To Mark Historic Tasks as Done:

    • Open your upcoming Published Version and click

    • Toggle Set Historic Tasks to Done

    To set a Promised Period:

    • Open your upcoming Published Version and click

    • Toggle Promise Tasks

    • Pick a date for the Promised Period to end

    To send a notification:

    • Open your upcoming Published Version and click

    • Toggle Send Notification

    See also: Task Status


    Compare the live plan with any Published Version to see how things have moved. Spot where Tasks have slipped or improved as the plan progresses.

    • Click at the top off the Gantt

    • To compare the Live Plan to a previous week, select Baseline

    • This will show a list of all Published Versions on the Project

    • Select any option to see how how your current plan compares to your Baseline

    • Click at the top off the Gantt

    • Toggle Baseline


    You can open any historical Published Version to view the full plan exactly as it was at the time of publish. It’s fully interactive so you can use filters, open Task Details, view the Map - just like the live plan. The only difference is that everything is read-only, like an interactive PDF.

    Open a Published Version:

    • Click your Project Title in the top left and select Publishing

    • Locate the list of all Published Versions in your Project

    • Hover over an existing published version and click ...

    • Select View Version

    See also: Print Published Versions


    Published Versions can be Shared to Web to allow anyone (including non-Aphex users) to view the plan.

    Enable sharing:

    • Click your Project Title in the top left and select Publishing

    • Locate the list of all Published Versions in your Project

    • Hover over an existing published version and click ...

    • Toggle on Share to Web

    • Optionally toggle Include Baselines or Include Progress Updates

    • Copy the URL and share with anyone

    Who can use this feature?

    Project Admins can configure the publishing routine, publish the plan for the project and enable Share to Web.


    All Project users can open Published Versions, and copy the public URL.

    Set up the Publishing Routine

    How the Publishing Routine Works
    • Setting a Publication Frequency triggers notifications to all Task Owners that they need to Ready their plan before the deadline each week

    • Adds a Due Date above the Gantt, counting down till when you're expecting to create the next Published Version

    Publishing Routine Settings
    Option
    Function

    Check if the Plan is ready to Publish

    Publishing the Plan

    How Publishing Works
    • Published Versions include all project data, not just the lookahead or Made Ready tasks.

    • You can publish at any time, even if teams haven’t marked their work as ready or it’s not the Target Date.

    Publishing Automations

    How Publishing Automations Work
    Property
    Description

    Compare the Live Plan to a Published Version

    To turn on a Published Version Baseline:

    To turn on the Baseline start and finish column :

    Open Published Versions

    What’s Not Included in a Published Version

    Everything in the Live Plan is mirrored in the Published Version, aside from a fey key exceptions:

    Not Included

    Shared Published Versions

    Controlling Public Data
    • At any time, Admins can turn Share to Web off. This will mean no-one can access any data via the Shared URL.

    Included Data (optional)
    Information shared
    Select the , or tool to draw a Work Area
  • Adjust the work area shape by dragging and dropping if needed, click on the fab to exit

    • On the Gantt, open the column picker and toggle Location and Work Area

    • Make sure the Task you want to mark up has the correct Location assigned

    • Double-click the Work Area cell to open the drawing window

    • Select the pen tool to draw a Work Area and click to mark each corner of the shape - no need to click and drag

    • Once the shape is complete, the cell will show that a Work Area has been added

    • The task can now be viewed on the Map

    You can easily add the same Work Area to multiple Tasks by copying and pasting from the Work Area column:

    • In the Work Area column, select the cell with the Work Area to copy and press CTRL + C on your keyboard

    • Select the Work Area cell of the desired Task and press CTRL + V to paste the Work Area

    See also: open a Map View


    If a Task clashes with another, you’ll see it right away on the Gantt. Clashing Task Bars turn red instantly, and selecting a Task highlights which days are safe to move to, and which would still result in a clash.

    • Clashing Task Bars always appear red regardless of your settings or overlays

    • Single click a clashing Task Bar to see available dates on the Gantt

    • Aphex scans the full project and highlights cells behind the Task:

      • Red = moving here would still cause a clash

      • Blue = safe to move, no clash detected

    • Open a Map View

    • Click

    • Select Highlight Issues

    • Pick Clashes

    • Tasks with clashes will have their Work Areas shown in red

    • Tasks with Clashes will display this icon


    The Clashing Tasks panel shows every active clash across your project. Filter by owner, location or date range, and resolve Clash pairs directly from the panel in both Gantt and Map views.

    • Click the Clashes Iconin panel toward the right of the Gantt

    • The Clashes Panel will open

    • Choose between Clashes , Non-Conflicting & For Review

    See also: Make Ready


    Once you’ve identified a clash, there are a few ways to resolve it. You can adjust the Dates, Shift, or Work Areas of the Tasks involved, helping create clear separation in time or space. If the clash isn’t actually a problem, and both Tasks can go ahead as planned, you can mark them as non-conflicting.

    • Click the Clashes Iconin panel toward the right of the Gantt

    • Click and bulk select the pairs you want to resolve

    • Click

    • Pairs you fully own resolve immediately, pairs you only partially own send a request to the other owner


    You can filter any view to show just the clashing Tasks. It’s useful for Task Owners working through their own issues, or for Reviewers/Admins checking the plan’s readiness across the project.

    • Click and

    • Select Issue in the first dropdown

    • Select from Is or Is Not in the second dropdown

    • Select Clash in the third dropdown

    Your Project comes with a pre-made Clashing Tasks View.

    • Click + Views within the open View Tabs

    • Select Clashing Tasks View

    See also: create and share Views

    Who can use this feature?

    Task Owners, Assignees and Admins can add Work Areas to tasks.


    Clashes are visible to everyone on the Project. Admins and Task Owners can resolve Clashes.

    Marking up a Work Area

    To draw a Work Area on the Map:

    To draw a Work Area on the Gantt:

    Add a Work Area to multiple tasks on the Gantt:

    Tip!

    If you have multiple Tasks in a row that need the same Work Area:

    • Hold SHIFT between selecting the top and bottom cell to highlight everything in between, then CTRL + V will paste the Work Area into all of the Tasks at once

    Work Area Rules & Behaviour
    • Each task can have only one Work Area

      • To represent multiple areas, break the task into subtasks and assign a different Work Area to each

    Identifying Clashes in the Plan

    To spot clashes on the Gantt:

    To highlight clashes on Map:

    To see clashes on Board and List:

    Clash Detection Rules

    A clash will only be triggered when all of the following are true:

    • The Tasks are in the present or future

    • The Tasks have overlapping Dates

    Find Clashes within the project

    To open the Clashes Panel:

    Clashing states
    State
    Tab
    What it means
    Clashes Panel Rules & Logic
    • Use the config icon in the top-right of the panel to adjust what you see. Filters apply across all three tabs simultaneously and are saved per user

    • For review shows your personal inbox for incoming non-conflicting requests from other Task Owners. Only shows requests relevant to your Tasks. Admins have no visibility of all requests.

    Bulk Resolving Clashes

    To mark Tasks as non-conflicting:

    Non-Conflicting Rules

    Permissions:

    • Admins can mark any Clash as Non-Conflicting

    • Users who are Owners or of both clashing Tasks or or owns one task and the other is owned by an Admin or Task Delegate can mark their own Clashes as Non-Conflicting

    Filter for Clashes

    To filter to Tasks with Clashes:

    Pre-made Clashes View:

    On the current Target and is in accordance with the daily forecast rate

    Under the current target and could mean the duration of the task can be shortened

    Multi-Select

    Promised

    Task Bar Visualisation

    Done

    Task Bar Visualisation

    Planned

    Task Bar Visualisation

    Multi-Select

    Progress Updates

    Who can use this feature?

    Admins, Task Owners and Assignees can add Progress Updates to Tasks.

    Progress Updates can be recorded to represent any delays and improvements made to a Task over time. As the plan progresses the team can log updates to keep the plan accurate and allow for a deeper understanding of the leading causes of delay and who's responsible.

    Adding Delays to Tasks


    Delays can be added to any day of a Task to show it's no longer on track to finish as planned. Just hit the Thumbs Down, choose a Delay Reason, log the days of impact and add optional comments or photos. It'll update the schedule automatically ad start building your delay history. Delays can be added to a Task from anywhere in the project, but let's start by looking at recording a Delay from List View.

    To Delay a Task from List View:

    • Open a List View

    • Click on the Task card

    • Configure your delay by selecting a Delay Reason, impact type, days of impact, comments, images and record date


    Use the Thumbs Up to mark a Task as On Schedule. You can log that work went ahead as planned or even ahead of schedule, and optionally pull the end date in if things are moving faster than expected. Improvements can be added to a Task from anywhere in the project, but let's start by looking at recording one from List View.

    • Open a List View

    • Click on the Task card

    • Configure your On Schedule or Shorten event by selecting an impact type, days of impact, comments


    Changing the dates of a Promised Task will automatically trigger a Progress Update. Changing the dates of Promised Tasks in a chain will trigger an option to apply Progress Updates to other Tasks that are Promised in the chain.

    • Update the end of a Promised Task

    • Configure your Delay by selecting a Delay Reason, impact type, days of impact, comments, images and record date

    • If you have additional Promised Successors, choose Yes to apply the same delay to the linked Tasks

    • Select

    See also:


    When a Progress Update is added, the Task Colour for that day will change to show the Progress Update added for that day. Red represents a Delay and green represents On Track or Shortened.

    • Open

    • Make sure that Show Progress Updates is enabled

    • Days with delays turn red

    • Days that are On Track or Improved turn green


    Each Task keeps a running record of delays, improvements and updates - including who made the change, when it was logged and what the impact was.

    • Right Click a Task and select View Details

    • Click the icon to open the Activity Log

    • See a chronological list of all Delays and Improvements added to the Task over time

    See also:


    If a delay or improvement was logged by mistake, it can be removed from the Task. The original event itself will still be visible in the Task's activity log as a past record, but the delay & impact will not count on the Task any longer.

    • Open the Task in the right-hand panel and click

    • Hover over the Progress Update and click the ...

    • Click Delete


    Creating Delay Reasons lets you build a reusable library of Delay Reasons to add when adding a delay to Tasks.

    • Open the Delay Reasons page, then click

    • Create your custom Delay Reason by entering a name and selecting a category


    Once Delays have been logged, you can filter any View to show Tasks impacted by specific Delay Reasons - or simply highlight all Tasks that have recieved any Delay at all.

    • Click and

    • Select Delay Reason in the first dropdown

    • Select from Is, Is Not, Is Empty and Is Not Empty

    See also: create & share


    As the team starts to record delays against Tasks, all updates (including Delays, On Track & Improvement events) can be traced back to the responsible Task Owner or Subcontractor. This makes it easy to understand how all parties are performing across the project.

    User Power BI to build custom reporting on delays and performance, based on data in your weekly Published Versions. Aphex provides free templates as a starting point but everything can be customised to suit your project reporting requirements.

    Utilise Aphex Insight to track Delay Concentration by Delay Reason. See trends and drill down into specific Tasks to identify which Delay Reason has the highest delay concentration.

    See also:

    Materials

    Who can use this feature

    Admins can create and manage Materials


    All project users can add Materials to their Tasks and log actuals

    Materials can be added to Tasks to forecast your daily resource demand and track planned vs actual quantities.

    Creating Materials


    Creating Materials lets you build a reusable library of Materials to assign to Tasks.

    Creating New Materials:

    • Click your Project Title in the top left, then select Project Assets

    • Select Materials from the menu

    • click

    • Create your custom Material resource by entering the name, unit, Material type and colour

    • The Material is added to the library of Materials the team can assign to their Tasks


    Assigning Materials to tasks helps plan how much is needed for each one, making it easier to manage demand across your project.

    To add Planned Materials to a task:

    • On the Gantt, navigate to the column picker and toggle Materials

    • Click the Material cell for your task & select Materials from the dropdown menu

    See also:


    When you add a planned Material, Aphex spreads the total amount across the Task’s planned days. If you expect to use more or less of a material on a certain day, you can adjust the daily quantity to match.

    • Double-click your task bar on the Gantt to open the right-hand panel

    • Scroll down to Planned Resources and click to expand your chosen Material

    • Click into the Quantity box and change the value


    Material tracking doesn't just stop at forecasting demand. Use Actuals to log what was used each day, directly on the Task - giving you a clear picture of performance over time, and use the inputs to automatically generate planned vs actual quantity reports.

    Adding Actuals to Tasks:

    • Double-click your task bar on the Gantt to open the right-hand panel

    • Scroll down to Actual Materials and click to expand your chosen Material

    • Click and select a planned material

    • Pick a day to record the Actual against, enter the Quantity and click


    Use the Resource Overlay in the Gantt to forecast Material demand day by day. You'll see how much of each Material is needed across the project, with a clear breakdown of which Tasks are driving that usage and who's using it.

    View the Resource Overlay by Material:

    • Click and select Resources and click Material

    • Hover over the numbers to view your Total and Project Utilisation

    • Click to filter to a specific Material type

    See also:


    Filter by Material to quickly review and manage work related to a particular Material items across your plan.

    • Click and

    • Select Material in the first dropdown

    • Select from Is, Is Not, Is Empty or Is Not Empty

    See also: create & share


    Once Materials have been assigned to Tasks, all updates (including Delays, On Track & Improvement events) can be traced back to each Subcontractor. This makes it easy to understand how each Subcontractor is performing across the project.

    Connect your Project as a datasource for Power BI to report on Material Demand, and track Planned vs Actuals.

    Utilise Aphex Insight to track Material Demand. See trends and drill down into specific Tasks to identify where each Material Resource is allocated.

    See also:

    Map

    Map View gives you a visual way to track work on site. Use it for daily coordination, spotting clashes, creating automatic staging diagrams, or to walk others through what’s happening; where, when & who. Maps can be simple floor plans or real-world maps with coordinates, and can connect to external layers like GIS data or drone imagery.

    Every Task on the Map is tied to the schedule, so when the plan moves, the Map automatically updates too.


    Each Project can have multiple Maps. From static Site GAs to geolocated Maps - pick the one you want to view and work with. You'll only see Tasks linked to that Map.

    • Click + Views at the top of the View Tabs

    Single-Select from the Project User list, Teams or Me (dynamic - will always show Tasks owned by the logged in user)

    Assignee

    Is Is Not Is Empty Is Not Empty

    Multi-Select from the Project User list, Teams or Me (dynamic - will always show Tasks assigned to the logged in user)

    Package Tag Colour

    User-selected colour to represent the Package

    Owner

    User that is accountable for the Package

    Start

    Start date of the first Task within the Package

    End

    End date of the last Task within the Package

    Assigned to

    User(s) that have been assigned to all Tasks inside the Package

    Notes

    Additional text notes that can be attached the Package

    Comments

    Thread of communications on the Package

    Documents

    Documents that have been uploaded and attached to the Package

    Multi-Select

    Compacting Equipment

    Concrete Placement

    Concrete pumps

    Cranes

    Dozers

    Dumper

    Earthmoving Equipment

    Excavators

    Forklifts

    Graders

    Lifting Equipment

    Marine Equipment

    Other

    Painting and Coating Equipment

    Piling Equipment

    Piling Rigs

    Rollers

    Small or Hand Tools

    Tipper Lorrys (20 Tonne)

    Trucks and Lorries

    Wheeled Loaders

    Project Utilisation

    The demand for your entire project

    Hide Un-utilised resources

    Removes resources that aren’t assigned to any Tasks from the resource list

    Multi-Select

    Plant

    Is Is Not Is Empty Is Not Empty

    Multi-Select

    Multi-Select

    Safety

    Environmental

    External Stakeholder

    Quality

    Resource

    Other Permit

    N / A

    Overdue

    The Blocker has a Due Date that lies anywhere from Yesterday and into the past

    Resolved

    The Blocker has manually been marked as completed by a Project User

    Multi-Select

    Blocker Status

    Is Is Not

    Multi-Select

    Teams typically set the Publishing Frequency to align with their weekly planning meetings. E.G if your Lookahead meeting is on a Friday, set the Publishing Deadline for Thursday at 5pm so you can ensure all Task Owners have updated their plans ahead of the meeting, and so that you can create the offical weekly Publish in time for the session

    Projects set a recurring target for when users should create a new Published Version.

    Time

    The time of the next Publication deadline.

    Timezone

    The timezone for the project

    Frequency

    A recurring target for when users should create a new Published Version.

    Publication Requirements

    Set specific fields which are required for publishing. As users update their plans these will flag as missing data if fields are left incomplete.

    Versions are created manually; they won’t be published automatically on the Target Date.
  • Each version is numbered by default (e.g. Published Version 1), but you can rename them at any time.

  • Creating a Version adds it as a historical record within the Project.

  • All Tasks prior to the Publication Date (Today) will have their Status set to ‘Done’. This will lock Progress Updates and Start & End Dates. Task Status can be changed at any time.

    Send Notification

    All users added to the Project Users list will receive an email with a link to the most recent Published Version

    Comments

    Saved Column Configs

    Blocker Summary Panel

    Milestone Summary Panel

    Board View

    List View

    Baselines

    Allow guests to see all historic baselines from previous versions and imports

    Progress Updates

    Allow guests to see all Progress Updates (delays & improvements) recorded on tasks

    Lookahead Period

    The lookahead period is the window of time where all plans are expected to be kept up to date.

    Promise Tasks

    Tasks will be promised up to the date set. Promised Tasks will require statuses when editing their dates.

    Clashes

    Publication Frequency

    Set Historic Tasks to Done

    Documents

    Work Areas must be complete shapes
    • You’ll need to draw a closed polygon, open shapes aren’t supported

  • Snapping helps prevent accidental clashes

    • While drawing, your cursor will snap near the edges of existing shapes (but never directly on top) to help avoid overlap

  • You can use drawing tools like pen, rectangle, or circle to mark up the shape

    • Use the hand tool to pan around the map

    • Zoom controls help you focus on the right area before you start drawing

  • To edit a Work Area, just open it and drag the points to adjust the shape

  • To remove a Work Area, right-click the cell and select Clear

  • If no Work Area is needed, you can set the cell to No Work Area Required

    • This completes the field without drawing anything on the map

  • The Tasks are on the same Shift
  • The Work Areas overlap

  • The Tasks haven't been marked as Non-Conflicting with each other in the past

  • Pending Review

    For Review (recipient) / Clashes (requester)

    One owner has requested non-conflicting status; the other hasn't responded yet

    Non-Conflicting

    Non-Conflicting

    Both parties have agreed the pair is not a real conflict

    You are able to revert clashes that have been marked as non conflicting

    Users who are Owners of one clashing task can request to mark a Clash as Non-Conflicting

  • Users who are Owners of one clashing task and are a Task Delegate of the other task can mark their own Clashes as Non-Conflicting

  • What happens when a clash is marked as Non-Conflicting:

    • The two Tasks are permanently linked as non-conflicting

    • Even if the Dates or Work Areas change in the future, they will not trigger a clash again

    Clashing

    Clashes

    Detected clash, not yet resolved

    ,
    images
    and
    record date
    No
    to only apply the delay to the specific Task you edited

    The Net Delay Number is shown as a on the end of the Task Bar

    in the second dropdown
  • Select your desired Delay Reason in the third dropdown

  • Delay Types
    Type
    Description

    Extend

    A task’s end date has been delayed from the prior plan or commitment

    Progress Update Data

    For each working day of a Task, Progress Updates can be recorded to indicate performance. Each Progress Update includes the following data:

    Progress Update Property
    Description

    Date

    Adding Improvements to Tasks

    To Improve a Task from List View:

    Positive Impact Types
    Name
    Description

    On Schedule

    A task’s end date is confirmed as achievable.

    Delaying Promised Tasks

    To delay a promised Task:

    Progress Update Visualisation

    To see Progress Updates from the Gantt:

    View the Delay History of a Task

    To see the log of all Task Progress Updates:

    Deleting Progress

    Delete a Progress Update:

    Deleting Progress rules
    • Deleting Progress will not impact the dates of the task, however it does delete the record and will not appear in any reporting.

    • The Progress Update Visualisation from the Task bar will be removed and the activity log stricken out.

    Create Custom Delay Reasons

    Creating a new Delay Reason:

    Delay Categories

    Each delay reason needs to belong to one of the following categories:

    Delay Categories

    Delay Categories

    Filter by Delay Reason

    Filter by Delay Reason:

    Filter Breakdown
    Filter
    Operator
    Value

    Delay Reason

    Is Is Not Is Empty Is Not Empty

    Report on Delays

    Power BI

    Aphex Insight

    Promised Tasks
    Activity Log
    Views
    Connect to Power BI
    to confirm

    Click the Resources Configuration icon to switch between Tasks in View and Project Utilisation

  • Hover over to see the daily breakdown

  • in the second dropdown
  • Select your desired Material item in the third dropdown

  • Material Type

    Each material needs a Material Type from one of the following categories:

    Material Type

    Concreate

    Piles

    Material Unit

    Each material needs a Material Unit from one of the following categories:

    Material Unit

    Item

    Assigning Materials

    Material Property Rules
    • Materials are a multi-select property

    • A Quantity of the Material can be inputted when adding Materials to tasks

    • Quantities are applied per day

      • The unit quantity is split across the task's duration

    • Archived Material resources will no longer be available to add to tasks but will still exist on tasks it was assigned to before the resource was archived

    Editing Planned Daily Quantities

    To adjust the daily planned quantities:

    Material Actuals

    View Forecasted Materials on the Gantt

    What's Shown on Hover

    On hover, the daily breakdown includes:

    • Utilisation

      • Quantity of Material used by Tasks in your current View (respects filters)

    • # of Tasks

      • Number of Tasks in your current View using that Material on the selected day (respects filters)

    • Project Utilisation

      • Total quantity used across the entire project (ignores filters)

    • # no of Project Tasks

      • Number of Project-wide Tasks using that material on the selected day (ignores filters)

    • Task Owner Breakdown

      • Lists each Task Owner contributing to Project usage

      • Includes Task Count and percentage of total utilisation for that day and Material

    • Cell shading

      • Darker = higher quantity

      • Lighter - lower quantity

      • Scale is relative to the values shown in the current overlay

    • Quantity values are only shown in Day View

      • In Week, Month or Year mode, cell shading remains but numeric values are hidden

    Resource Overlay Configuration Options
    Option
    Function

    Total

    The demand for tasks in your current view

    Filter by Material

    Filter by Material:

    Filter Breakdown
    Filter
    Operator
    Value

    Material

    Is Is Not Is Empty Is Not Empty

    Report on Planned vs Actual Material

    Power BI

    Aphex Insight

    Bulk Edits
    Export Material Demand
    Views
    Connect to Power BI

    Scroll through Views you & your team have created, or Views Aphex has provided

  • Open any Map View

    • Open any Map View

    • In the top left, open the Map Selector

    • Click into the Map you want to open

    See: Locations and Printing the Map


    Use the Date Picker to show what's happening on site for a certain day, week, month or custom range.

    • Click the Date Range at the top of the Map

    • Pick one of the shortcuts: Today, Next Week, This Month or use the calendar to select a specific date range

    • Use the < arrows > to move forward or back in time


    The Task List on Map Views can be organised into different groups, depending on what type of set up you need.

    • Click at the top of the Map View

    • Select how you want to group tasks


    Clicking a task on the Map will open its full details in a panel, right on top of the Map. You can view, update or progress the Task without moving away from your current view.

    • Click any Task Card from the section on the left hand-side

    • Or, click the Work Area on the Map and then the icon

    • The Task Panel will open

    • Click the Work Area on the Map to open the Task Preview

    • Click any of the Progress Bars, underneath any of the current or past Task Days

    • Select or

    • Record the delay

    See also: Progress Updates


    You can toggle external map layers on or off to bring in additional site context, like utilities, drone flyovers, or design information, without crowding the Map view when they’re not needed.

    • Open a Map View

    • Click into the tab in the left-hand panel

    • Use the to turn Layers on and off

      • Toggle individual sublayers for more detailed control

      • Hold SHIFT then Click to turn multiple on and off at once

    • Open a Map View

    • Click into the tab in the left-hand panel

    • Swap between Satellite, Street or None

    See also: Add Map Layers


    You can change how Work Areas are colour-coded on the map to reflect what matters most during planning. Switch between colours for Task Owner, Subcontractor, or Shift, or choose to highlight Clashes and Overdue Blockers in red when you need to spot issues quickly.

    • Click and select Work Area Colour

    • Pick from Subcontractor, Owner or Shift

    • Click and select Highlight Issues

    • Pick from Clashes or Overdue Blockers


    Filters in Aphex let you show only what matters, whether that’s Tasks with certain properties, or ones that are missing something. Keep it simple or build something more detailed, it's up to you.

    • Click at the top of the Map

    • In the dropdown that appears select and choose the property you'd like to filter by

    • Change the logic from options like or to or to hide or reveal the relevant Tasks

    • Click to swap between and

    See also: Saving a View


    Markups turn the map into a richer planning surface where you can annotate visual context using polygons, arrows, text, and icons across named layers you can toggle on or off - ideal for traffic layouts, briefing notes, and risk callouts. Kept entirely separate from scheduled work, they never affect clashes, connected external layers, or work areas.

    • Open a Map View

    • Click into the tab in the left-hand panel

    • Click

    • Use the Editor menu to add polygons, arrows, text or icons to your layer

    • Use theto turn Layers on and off

    If you want to add more mark-ups later, just click the Layer title in the left-hand panel to bring up the Editor menu.

    Who can use this feature?

    Project Users with Full Planner Access can create and open Map Views.

    Open a Map View

    To open a Map View:

    To change which Map you're viewing:

    Set the Date Range

    To choose what time frame you want to see on the Map:

    Date Range Options
    Option
    Function

    Organise the Task List

    To change the Grouping on Map:

    Grouping Options
    Primary Group
    Sub-Group

    Interact with Tasks on the Map

    To open a Task on the Map:

    To record Task Progress from the Map:

    Show or Hide External Map Layers

    To turn Map Layers on or off:

    To switch the base map:

    Colour Code the Map

    To change the colour of Work Areas:

    To highlight Clashes or Blockers on the Map in red:

    Filter the Map

    To filter a Map View:

    Filter Logic & Rules
    • All as well as can be applied as a filter

    • Archived values that are still in use will appear as filter options. Unused archived values will be hidden from the filter options

    Markup Layers

    To create and annotate Markup Layers:

    Markup Layer rules
    • Markup layer order is user-specific and isn't saved as part of the view definition

    • There is no limit on how many can be created

    • Once created, markups are available to the whole project (they're not personal/private)

    Tasks

    Who can use this feature?

    Any Project User with full Planner Access can create Tasks. Task Owners, Assignees and Admins can edit Tasks.


    Task Owners and Admins can delete Tasks.

    When you add a Task, you can customise its properties to reflect exactly what’s being done, by who, and when, making sure the plan communicates clearly to anyone who needs to see it.

    Tasks can store everything from planned resource quantities and work areas to subcontractor assignments and permit requirements. This way, as your plan changes, not only does everything reschedule automatically, but things like resource forecasts, staging diagrams and daily task-lists update on the spot.

    Creating Tasks


    You can create Tasks from wherever you’re working - from the Gantt, from the Board, or imported from another source. For an easy start, try adding them directly inside your Folder structure.

    To create a Task:

    • On the Gantt, find the Folder where you want the Task to live

    • Select at the bottom of the group

    • Your new Task will appear as a line item within that Folder, ready to edit

    See also:


    Tasks can be edited at any time; whether you're refining the plan, making updates as work progresses, or finalising details for the as-built record. You can update Tasks one by one or in bulk. Let's look at making edits across a selection of Tasks.

    • Use the to select all Tasks you want to update

    • Hold Shift on your keyboard to quickly select everything in between

    • Once selected, the multi-select toolbar will appear at the bottom of the Gantt

    • Click the

    See also: editing via


    Drag-and-drop Tasks on the Gantt to easily adjust the start and end dates.

    • Hover over the Task Bar on the Gantt

    • Drag either end of the Task Bar to extend or shorten its Duration

    • Drag the middle to shift the entire Task forward or backward in time


    Subtasks work just like regular Tasks, with all the same properties, but are nested inside a Parent Task. They’re ideal for breaking down higher-level activities, especially when importing from a Master Schedule, while keeping a clear link back to the source activity.

    • Hover over the Task you want to break down

    • Click

    • Hover over Add Subtasks

    • Enter the number of Subtasks you want to create

    Subtasks can only go one level deep (Parent → Subtask). If you need more structure, it's best to use Subfolders to build out your plan.

    See also:


    Subtasks can be moved from one Parent Task to another, as long as a few conditions are met.

    • Click the column picker towards the top left of the Gantt

    • Toggle on the Parent column

    • Click into the cell for the Subtask you want to move

    • Select the new Parent Task from the list


    • Use the to select all Tasks you want to duplicate

    • Hold Shift on your keyboard to quickly select everything in between

    • Once selected, the multi-select toolbar will appear at the bottom of the Gantt

    • Click

    • Hover over the Task Name

    • Select

    • Select Duplicate


    • Use the to select all Tasks you want to delete

    • Hold Shift on your keyboard to quickly select everything in between

    • Once selected, the multi-select toolbar will appear at the bottom of the Gantt

    • Select

    • Hover over the Task Name

    • Select

    • Select Delete Task


    If you have multiple Aphex Projects, you may want to move Tasks & assets from one to another. We'll show you how.

    • Use the to select all Tasks you want to copy

    • Hold Shift on your keyboard to quickly select everything in between

    • Once selected, the multi-select toolbar will appear at the bottom of the Gantt

    • Click the


    You can open a Task from anywhere; Gantt, Map, Board, or List View. Just click the task to open the full Task Panel, right on top of your current view so you won’t lose your place. Reorder the panel sections to keep the most relevant info where you need it.

    • Right-click any Task and select View Details

    • The Task Panel will open

    • Click any Task Card from the section on the left hand-side

    • Or, click the Work Area on the Map and then the icon

    • The Task Panel will open

    • Click any Task Card on Board

    • The Task Panel will open

    • Click the name of any Task in your List

    • The Task Panel will open


    The Task Activity Log shows a full history of every change, from edits and delays to comments & documents, with who made the change and when.

    • Right-click any Task and select View Details

    • The Task Panel will open

    • Click to toggle the Activity Log on or off

    • Right-click any Task and select View Details

    • The Task Panel will open

    • Start typing into the Add Comment box at the bottom of the panel

    • Right-click any Task and select View Details

    • The Task Panel will open

    • Click the at the bottom of the panel

    • Select or to upload an image or document

    Relationship Links

    Who can use this feature?

    Task Owners, Assignees and Admins can add relationship links between tasks

    Relationship Links in Aphex allow you to establish task dependencies, ensuring tasks are completed in the correct order. Whether you need tasks to start together, finish together, or follow one another, Relationship Links help keep your project on track and aligned.

    Drawing Relationship Links


    You can draw links directly on the Gantt - just click and drag from one bar to another. The link type is set based on where you start and end. It’s quick, visual, and often the easiest way to build out your logic as you go.

    How to Draw a Relationship Link:

    • Hover over the Predecessor Task Bar and click the

    • Click and drag from the predecessor to the successor

    • Release the mouse to automatically create the relationship.


    Spotlight Mode helps you quickly see how a task connects to the rest of the plan. Instead of manually tracing arrows or opening extra panels, you can highlight a task and follow its linked pathway directly on the Gantt, with hints showing where the sequence continues off screen.

    • Select a Task Bar on the Gantt

    • Click the Spotlight Button that appears next to the Task

    • The linked pathway will be highlighted immediately

    • Look for the small Pathway Hint tags at the edges of the screen

    • These show how many linked Tasks sit just out of view

    • Click a hint to preview the linked Tasks or jump directly to them

    • Click the X in the banner

    • Refreshing the page or logging out will also disable Spotlight Mode


    Checkboxes let you select multiple Tasks and build logic between them all at once. Set the sequence, adjust the link type & lag, and apply. It’s the fastest way to build out a full section of your plan.

    • Hover over tasks and click

    • Click the Link icon in the multi-select toolbar

    • Choose the link type (SS, SF, FS, FF), add any lag if needed and confirm


    If the Task you want to link to isn’t visible, drop your link on the blue search icon. A menu will open so you can quickly search and select the right Task without changing your filters or losing your place.

    • Hover over the Predecessor Task and click the

    • Click and drag to

    • The Link Search Modal will appear. Use the search bar or filters to find the task you want to link

    • Select the task, choose the link type, and apply the relationship


    When you open a Task, you’ll see a full list of its linked Tasks including Link Type, Lag and Float/Driving. From here, you can make changes or add new relationships; no dragging or switching views required.

    • Open the Task Panel for the task you want to link.

    • Scroll to Related Tasks and click

    • The Link Search Menu will appear. Use the search bar or filters to find the task you want to link.

    • Select the task, choose the link type, and apply the relationship.


    Lag lets you add a space between linked Tasks, helping account for handovers, wait times, or real-world gaps without shifting tasks manually. As you adjust Tasks, Aphex gives you a quick visual cue showing how much lag you’ve just added or removed.

    • Use the Task Bar, or Start and End properties to edit the dates of the successor Task

    • The Lag Change Indicator appears, showing the number of lag days added or removed

    • Open the Task Panel for the Task you want to link.

    • Scroll to Related Tasks and click into the Lag field and enter a value

    • On the Gantt, click a Link Line

    • In the Link Modal, click into the Lag field and enter a value

    • Select to apply the Lag change to the relationship


    Each relationship between Tasks shows whether it’s Driving or how much Float it has. A Driving relationship means the predecessor has zero float - any change to it will move the successor. Links with float display how much flexibility exists before the successor is affected. These values update automatically as Task dates, link type, or lag change, helping you see which parts of the schedule are fixed and which still have room to move.

    • Click any relationship link on the Gantt - single or multiple

    • In the Link Menu that opens, Driving Tasks are marked with

    • Links that aren’t driving display their Float Value


    You can edit or break existing relationship links at any time to update or remove connections between Tasks.

    • On the Gantt, click a Link Line

    • In the Link Modal that opens, you can either:

      • edit the Link Type (FS, SF, FF, SS)

      • edit the Lag

    • On the Gantt, click a Link Line

    • In the Link Modal that opens, click Remove Link


    Understanding scheduling behaviour helps you predict how linked tasks behave when dates change based on whether they're Planned, Promised, or Done. It’s the key to controlling movement, Ripple Status, and Progress Updates in your plan.

    • Successor is Planned:

      • Both tasks reschedule freely.

      • Successor follows any changes to the Predecessor.

    • Successor is Promised or Done:

    See also:

    Views

    Who can use this feature?

    All Project Users can create and share Views.


    Project Users with Full Planner Access can open Gantt, Map & Board Views. Limited Planner Access Users can open List Views.

    Views let you customise how you see the plan, from full project Gantt charts, to Maps, Board Views, or focused daily Task Lists. Every View draws from the same underlying project data but can show different filters, groupings, overlays and layouts.

    Views can be saved for quick access - build Personal Views as shortcuts for your own use, or Shared Views to create standardisation for meetings or collaborative sessions.

    Create a New View


    To Create a View:

    • Click + View at the top of your page

    • Click Create new View

    • Choose from Gantt, Map, List and Board

    • Enter a name for your new View

    • Click Create View

    See also: how to use the , , &


    Shared Views are great when a group of people (or the whole project) will need to see the plan data & layout set up in a specific, consistent way.

    • Open the View you'd like to share

    • Select View Options on the right-hand side

    • Click Shared with and toggle on Shared View


    Any View you open is fully customisable. You can adjust filters, grouping, layout and view controls at any time to suit what you’re working on. If your changes differ from the Saved View definition, you can either save them (if you have edit access) or reset the view to return to its original definition.

    • Open a View

    • Make adjustments to the View Controls

    • Select Save View or Save View for Everyone in the top right

    • Open a View

    • Make adjustments to the View Controls

    • Select Reset View in the top right to return the View back to the Saved View definition


    Every project includes a set of pre-made views. You can adjust them as you work, or duplicate one to create your own saved version.


    Full screen mode expands your plan by hiding page headers, giving you more room to focus on the content inside your Gantt, Board, List, and Map views.

    • Open a new or existing View

    • Select View Options on the right-hand side

    • Click Full Screen

    • Or, use the Keyboard Shortcut

    • Move your cursor to the top of the Page

    • In the header that is revealed, select the Exit Full Screen Mode button

    • Or, use the Keyboard Shortcut Esc


    As you open Views, they appear as tabs at the top of the page so you can quickly switch between them. You can open as many as you need, reorder them to suit how you work, and hide them when you’re done, without affecting the view itself. Your open View tabs stay just the way you left them, ready for next time.

    Board

    Who can use this feature?

    Project Users with Full Planner Access can create and open Board Views.

    Board View gives you a whiteboard-style layout of your plan, powered by your lookahead. Drag and drop Tasks, record progress, and adjust your plan as work progresses - all changes update instantly across your schedule.

    Setting Your Date Range


    The date picker lets you choose how many weeks to display on the board, from one week up to four.

    To set a date range:

    • Click the date range

    • Select your preferred range at the top of the picker: 1 week, 2 week, 3 week or 4 week

    • Click any start date in the calendar, the end date calculates automatically


    Use the arrow controls, zoom slider and scrubber to move through your timeline and adjust how much of your plan is visible at once

    • Click to move forward or backward by one week

    • Click to jump to the current period

    • Shows one week in detail

    • Shows two weeks for a broader view

    • The highlighted shows what’s currently visible

    • Drag the highlighted section to move through your plan


    Board Views can be organised into different swim lanes, depending on what type of set up you need.

    • Click at the top of the Board View

    • Select how you want to group tasks

    • Use ⋮⋮ to drag your Groups in the order in which you want them to be displayed

    • Tasks and Groups will reorganise automatically


    • Click the in the bottom left-hand corner

    • Complete the Task details

    • Click to add it to the plan

    Tasks created from the Board use your current view to pre-fill details like Group and date.

    • Click on any visible Task Property

    • Select a new value

    • Changes are saved automatically


    • Change dates: Drag to a different day

    • Reorder: Drag up or down within a Group

    • Reassign: Drag between Groups

    Tasks on the Board will always be sorted by Start Date - the earlier a Task starts, the higher it will appear within it's grouping.

    Aphex will hold the position of your Tasks while you make edits, and then when you're ready to re-apply the Sort Order, click in the bottom right corner.

    Refreshing your Aphex window will also trigger the sort order to be re-applied to your Board View.


    Use Board to record how each day went and keep your plan up to date. Every update feeds into reporting and the wider schedule, with changes reflected instantly across all other Views.

    • Open and toggle Progress

    • Click the progress bar on the day you want to log an update

    • Choose to mark it on track or improved, or to record a delay

    • The progress bar will turn green or red based on the update type

    See also:


    See at a glance how many of your Tasks have been updated each day, with a live breakdown of what's on schedule, delayed or missing an update.

    • Click

    • Toggle Show Task Update Compliance

    • Click , or to filter to just that day

    • Optionally, click to show all missing updates of tasks today/past within the view


    Filters in Aphex let you show only what matters, whether that’s Tasks with certain properties, or ones that are missing something. Keep it simple or build something more detailed, it's up to you.

    • Click at the top of the Board

    • In the dropdown that appears select and choose the property you'd like to filter by

    • Change the logic from options like or to or to hide or reveal the relevant Tasks

    • Click to swap between and

    See also: creating & sharing


    Tailor your Board View to suit the way you plan & communicate. Adjust the layout, colour coding, visible days of the week and more.

    • Click at the top left of the Board

    • Toggle any property you'd like to display on the Task Cards

    • Use the ⋮⋮ drag handles to reorder the properties on the Task Cards


    • Click

    • Select Days

    • Pick from 5 Day, 6 Day or 7 Day

    • Click

    • Select Layout

    • Pick between Waterfall or Masonry

    • Click

    • Select Card Colour

    • Pick from Owner, Subcontractor or Shift

    See also:

    Move

    A tasks's start and end date has been moved (pushed later)

    Selected working day to record the event against

    Type

    Delayed On Schedule Improved

    Reason

    Reason for the change. This can be configured by each project individually and typically contains reasons such as "Awaiting Access".

    Amount

    Impact of the update is recorded in a Value that represents a duration in working days (+ or -)

    Amount by

    User who recorded the update

    Created at

    Timestamp of when the update was recorded

    Shorten

    A task’s end date has been improved (brought earlier).

    Move

    A tasks's start and end date has been moved (brought earlier)

    Environmental

    Inadequate Planning

    Insufficient Resources

    Prior Work

    Quality

    Safety

    Scope Change

    Submittals and Approvals

    Multi-select

    Earthworks

    Roadworks

    Electrical

    Drainage

    Steel

    Other

    Metres

    Metres Squared

    Metres Cubic

    Kilometers

    Kilograms

    Tonnes

    Tons

    Yards

    Yards Squared

    Yards Cubic

    Project Utilisation

    The demand for your entire project

    Hide Un-utilised resources

    Removes resources that aren’t assigned to any Tasks from the resource list

    Multi-Select

    Today’s Date

    This Week

    Monday to Sunday of the Current Week

    Next Week

    Next Monday to Sunday (1 week into the Future)

    Custom

    Custom dates selected by the user

    Advance Selected Range

    Move the date range forwards and backwards by your selected range

    Owner

    Folder

    Subcontractor

    Subcontractor

    Shift

    Shift

    None

    Tasks that do not match the filter criteria will be hidden from the Map
  • Markups are attached to the location, not the view

  • Markups are not linked to a task

  • Lookahead

    Current Week + (Project Lookahead Period - 1 Week)

    Owner

    Folder

    Today

    Package

    to open the list of properties to edit - pick the one you want to change
  • Select the new value from the list

  • Click the to confirm. Your update will be applied to all selected Tasks

  • Click the to confirm

  • Your Task is now a Parent Task with embedded Subtasks

  • To add more Subtasks later, click directly under the Parent Task

  • The Subtask will move under the selected Parent

    to duplicate all selected Tasks
  • Click Delete Tasks to delete all selected Tasks

  • and select
    Copy to an Aphex Project
  • Pick an existing Project or create a new one

  • Select whether to copy all Task Properties or pick from a custom list

  • Review the 'Copy Task Summary' and Click

  • Open the destination project: your tasks will be waiting on the Gantt

  • Uploaded files will appear in the Task Activity Log

  • Use filters to show only

  • Task Creation Rules
    • By default:

      • The user who creates the task is set as the Owner

      • The Project Default Calendar is automatically applied

      • Each task starts with a 1-day duration

      • Each new task will be placed on the nearest Monday within your current View

      (You can adjust these at any time)

    Task Types

    There are four Task types that you can create:

    • Task

    • Parent Task

    • Subtask

    • Milestone

    Editing Tasks

    To edit multiple Tasks:

    Task Selection Rules
    • Subtasks can only be multi-selected with others from the same Parent

    • You can’t mix Parents and Subtasks in the same selection

    • You can select any Task in the project

    • Tasks you don’t have permission to edit will be skipped, and you’ll be notified

    • After each action, you’ll get a summary of how many tasks were updated or skipped with the option to undo

    Drag & Drop Tasks

    To move a Task Bar:

    Creating Parent & Subtasks

    To breakdown a Task:

    Inherited Parent & Subtask Properties

    Parents & Subtasks will always have the same:

    • Owner

    • External ID (often mapped from the P6 Activity ID)

    • Package

    • Folder

    If one of these Properties are edited, this update will automatically apply to the Parent and all its Subtasks.

    All other Task Properties can be individually allocated to Subtasks.

    Parent Task Bar & Dates

    Parent Start Date = Start date of the earliest visible Subtask

    Parent End Date = End date of the latest visible Subtask

    These values update automatically when filters or date range settings are applied.

    See more about

    Moving Subtasks to a Different Parent Task

    To move a Subtask:

    Requirements for Moving Subtasks
    • The destination Parent Task must already be broken down (with at least one Subtask)

    • Both Parent Tasks must be Owned by the same User

    Duplicating Tasks

    To duplicate multiple Tasks:

    To duplicate an individual Task:

    Duplicated Task Rules
    • Tasks can be duplicated by any User who holds a Task Role

    • All Task properties will be duplicated automatically, excluding:

      • Progress Updates

      • Comments

      • Documents

      • Milestone History

      • Material Actuals

    • All Relationship Links between the duplicated Tasks will be duplicated

    Deleting Tasks

    To delete multiple Tasks:

    To delete an individual Task:

    Deleting Tasks Rules
    • Deleted tasks can’t be restored unless you undo the action during the same session

    • Only the Task Owner, an Owner Delegate, or a Project Admin can delete a Task

    Copying Tasks Between Projects

    To Copy Tasks into a different Project:

    Copying Tasks Rules
    • Links between selected Tasks will always be copied across

    • Task history (the activity log & progress updates) will not be copied over

    • If you do not select a property to be copied, a default option will be applied to the property

    • Copied Assets will match to existing Assets (if the Name or Code matches), otherwise new Assets will be created in the destination Project

    • Tasks can only be moved into Projects within the same Organisation

    Task Panel

    To open a Task from the Gantt:

    To open a Task from Map

    To open a Task from Board

    To open a Task from List

    Task Panel Preferences
    • The Task Panel is made up of sections that can be collapsed or reordered

    • Drag and drop sections to arrange them however you like

    • Your custom layout is saved to your user - it stays consistent across all Projects and Views, including Mobile

    • The layout will apply every time you open a task, until you change it again

    • There are different task panel layouts for Tasks, Parent Tasks, and Packages

    Task Activity Log

    To open the Activity Log:

    To comment on a Task:

    To upload a Photo or Document to a Task:

    Task Properties
    Gantt Columns
    Subfolders

    Click to apply edits to the relationship

    • Successor won’t move.

    • Only the Predecessor shifts.

    • Successor is Planned:

      • Successor moves freely and reschedules based on new Predecessor date.

    • Successor is Promised:

      • You’ll get a Ripple Status prompt.

      • Optionally apply the delay to the Successor.

    • Successor is Done:

      • Successor won’t move. Only the Promised Predecessor shifts.

    • The task is locked. You can’t move it.

    • Any changes must start from its Successors.

    Link Type and Direction
    Direction
    Visual
    Explainer

    Start > Start (SS)

    Scheduling Behaviour
    • Moving a driving task will reschedule all dependent successors in the chain

    • Tasks won’t lose their link logic - rescheduling respects the original structure

    • Updates happen in real time as you adjust dates, add delays or drag bars on the Gantt

    Highlight Linked Tasks on the Gantt

    Turn on Spotlight Mode

    Use pathway hints

    Exit Spotlight Mode

    Spotlight Mode Behaviour

    While Spotlight is active

    • Clicking another task switches the spotlight to that pathway

    • Up and down arrow keys change the spotlighted task

    • You can pan, scroll, and switch Views without disabling Spotlight

    • All normal task interactions remain available

    Selection behaviour

    • Spotlight follows the currently selected Task

    • Clicking into empty space deselects the Task and clears the Pathway Spotlight

    Printing

    • Spotlight is not included in print outputs

    • Printing does not disable Spotlight

    • Returning to the Gantt keeps Spotlight active

    Linking Multiple Tasks

    To Link Multiple Tasks:

    Link Search

    How to Link Tasks using the Link Modal:

    Creating Links from a Specific Task

    Adding a Relationship Link from the Task Panel:

    Add or Remove Lag

    Add Lag to Relationship Links from the Gantt:

    Add Lag to Relationship Links from the Task Panel:

    Add Lag to Relationship Links from the Link Modal:

    Lag Rules
    • The Predecessor Task Calendar is used to determine lag when added to a relationship link

    • When drawing Links on the Gantt, Aphex automatically applies zero-day lag, snapping the successor to come immediately after the predecessor

    • Hold Shift while drawing the link to keep the existing gap - Aphex will automatically calculate and apply the right lag to preserve the spacing between tasks

    • The Lag Change Indicator will be visible on the Gantt for a few seconds after the change is applied

    Identifying Driving Tasks

    To reveal Driving Tasks & Float from the Gantt:

    How Driving Tasks & Float are calculated
    • Float is the amount of time a predecessor task can move without delaying its successor

    • It’s calculated automatically using the start and finish dates of both tasks, the relationship type, and any lag that exists between them

    • When Float = 0, the predecessor is considered Driving - any change to it will immediately shift the successor’s dates

    • When Float > 0, the predecessor is non-driving and has flexibility before it impacts the successor

    • Float and Driving values update dynamically whenever task dates, relationship types, or lag are changed

    Example

    • Predecessor task finishes on: 1 September

    • Successor task starts on: 6 September

    • Lag: 1 day

    • Assume all days are working days

    Step-by-step:

    • Days between 1 Sep and 6 Sept (inclusive): 5 days

    • Float = 5 - 0 - 1 = 4 days

    The predecessor has 4 days of float. It can finish as late as 5 September without delaying the successor

    Editing & Breaking Links

    How to edit an existing Link:

    Breaking Relationship Links:

    Understanding Scheduling Behaviour

    Task Status

    Choose to share your View with Everyone or specific Users & Teams

  • Select if users can Edit View or have View Only access

  • Alt
    +
    Enter
    View Access
    • Project Users with Full Planner Access can open and create Gantt, Map & Board Views. Limited Planner Access Users can open List Views

    • Every newly created View begins as a Personal View

    • Personal views are only visible in the project's Views List to the view's author and Project Admins. Other users won't see someone else's personal view in the Views List, but they can still access it if they have been given the direct URL

    Share a View

    To Share a View:

    Who can change the Sharing Controls
    • The user who creates the View is the View Author

    • View Authors can toggle between Personal/Shared, set editors, rename, delete, convert, and override the saved definition

    • Project Admins have the same permissions as View Authors, and can change sharing controls for all views in the project

    Author, Editor & Viewer Permissions
    • Adding a user or team to Shared with makes that view available in their Shared with you section. The next time they create or open a view, it’ll appear at the top of their suggested views.

    • View Authors: The user who initially created the View will become the View Author.

    • View Authors can:

      • Open the View from the View List

      • Toggle their view between Personal & Shared

      • Specify certain Users & Teams as 'View Editors'

      • Rename the View

    Project Admins have the same permissions as View Authors

    • Editors: A User or Team who have been named as an Editor on a specific Shared View.

    • Editors can:

      • Open the View from the View List

      • Duplicate the View

    Saving & Resetting Views

    To override the Saved View definition:

    To Reset the View:

    Saved as part of the View Definition

    These settings are specific to each page type and contribute to the View Definition. Any changes made here will allow users to override the saved definition

    Gantt:

    • Grouping

    • Overlays

    • Filters

    • Columns

    • Custom Group Order

    • Date Range

    Map:

    • Grouping

    • Filters

    • Location

    Board:

    • Grouping

    • Filters

    List

    • Grouping

    • Filters

    Saved as Personal View preference

    These specific settings won't prompt you to save changes, as they don't contribute to the View Definition. They will be remembered between sessions and won't reset when you refresh the page, close the view, or log out

    Gantt:

    • Column Widths

    • Group Order

    • Expanded/Collapsed Headers

    • Zoom

    • Work Area Panel preferences

    • Bar Colour

    • Show Progress / Relationships / Overdue Blockers

    Map:

    • Layer visibility & Basemap

    • Location / Zoom extents

    • Work Area Colour

    • Highlight Issues

    Board:

    • Hidden Groups

    • Group Order

    • Layout

    • Days

    List:

    • Task Properties

    Aphex Provided Views

    List of Aphex Curated Views
    View Name
    View Type
    Definiton

    All Upcoming Plans

    When a new user with Full Planner Access enters a project for the first time, the two Aphex Curated Views that will open by default are:

    • My Upcoming Plan

    • All Upcoming Plans

    When a new user with Limited Planner Access enters a project for the first time, the two Aphex Curated Views that will open by default are:

    • My Daily Briefing List

    • Project Daily Briefing List

    Full Screen Mode

    To turn on Full Screen Mode:

    To turn off Full Screen Mode:

    How Full Screen Works

    Full Screen Mode is in Planner only, it is available across all views but cannot be the default for a specific view.

    The headers displaying views, view options, Project Settings/Assets, filters etc. will be accessible when moving the mouse over to the top of the screen. Exiting Full Screen

    Hit 'ESC' on your keyboard or hover over the top section of your screen and click 'Exit Full Screen' on the revealed headers.

    Refreshing your browser window or navigating to Home or Insight will also exit Full Screen.

    Visibility

    Full Screen Mode applies only to the user who enables it and only on the specific device used.

    Managing Views

    Gantt
    Map
    List
    Board

    Click to dismiss

    Optionally, click the > beside the property to open more options
  • Use the to hide specific values within that property from view

  • Multiple weeks Logic & Rules

    • Ranges span forward from the date you click, you only need to select a start date

    • Mid-week selections are supported (e.g., Wednesday to Wednesday)

    • Ranges shorter than one week are not supported

    • Your last selected range length is remembered across sessions

    Navigating the Board

    To change the Timeframe :

    Zoom

    Scrubber

    Navigation Logic & Rules

    • Click and drag anywhere on the board to pan

    • Hold Shift and use your mouse wheel to scroll horizontally

    • Both the zoom control and scrubber are hidden when your date range is set to 1 week only

    How Tasks are Grouped

    To change the Grouping:

    Grouping Options
    Primary Group
    Sub-Group

    Owner

    Folder

    Create & Edit Tasks

    To create a Task on Board:

    To edit a Task on Board:

    Moving Tasks

    To drag and drop Tasks on Board:

    Reordering Tasks

    Moving Tasks Logic & Rules

    • The Task stays exactly where you place it

    • Tasks will not automatically reorder after being moved unless tidy up has been clicked

    Recording Task Progress

    To record a Delay or Improvement:

    Monitor Daily Task Progress

    Task Update Compliance Logic & Rules
    • Toggling on Task Update Compliance is per-user and won't affect anyone else's view

    • Compliance counts update in real time

    • Only Tasks visible in your current view and date range are counted

    • If a Task is assigned to multiple people and appears in multiple Groups, it's only counted once

    Filtering the Board

    To filter a Board View:

    Filter Logic & Rules
    • All Task Properties as well as Unresolved Issues can be applied as a filter

    • Archived values that are still in use will appear as filter options. Unused archived values will be hidden from the filter options

    • Tasks that do not match the filter criteria will be hidden from the Board

    Customise Task Properties

    To hide or reveal properties:

    Customise the Board Layout

    To change the visible days:

    To switch the Board Layout:

    To colour code Task Cards on Board:

    Board View Options
    Colour
    Description

    Subcontractor

    The colour of the Tasks allocated Subcontractor

    • Relationship links can also be hidden or displayed by toggling the property on and off in the View Options menu.

      • Relationship links will be turned off when grouping by assignee.

    Progress Updates
    Views
    Print Board

    Master Schedule Import

    Project Admins or Members with Additional Permissions can run Master Schedule Imports.

    Bring selected parts of your Master Schedule into Aphex using XER, XML, or MPP files from P6, Asta, or MS Project. Import only the activities your team needs - this helps seed the lookahead plan with the right level of detail or key Milestones - just enough for the team to breakdown, adjust and build from.

    Upload your File


    The first step is to upload your file.

    To upload your XER, XML or MPP file:

    • Click your Project Title in the top left

    • Select Master Schedule Import from the dropdown menu

    • Click

    • Upload your File


    Choose exactly which Tasks to bring into Aphex. Use a custom field (like a UDF in P6) to flag only the relevant Tasks you want to import; for example, bringing in Construction activities while skipping Design or Procurement.

    • Click the Column dropdown and select the UDF column you want to filter by

    • Click the Value dropdown and choose the value you want to import

    • Click


    Importing your schedule in smaller timeframes helps keep things tidy. Most projects avoid bringing in the entire long-range plan at once. By importing just what's needed for the next stage, then running regular imports (e.g. monthly) to add the next few weeks as the project moves forward, you give the team relevant, up to date data they can build from.

    • Select from Next 4 Weeks, Next 12 Weeks, All Future, All Past and Future

    • Click


    To keep Aphex simple & intuitive, some Master Schedule features aren’t supported. During import, you’ll be prompted to make smart decisions about how to handle things like actual dates, or LoE / WBS Summary Bars that don’t translate 1:1. This helps ensure Tasks still land on the dates they’re supposed to.

    If your Import file contains WBS Summaries or Level of Effort (LoE) Tasks, you can choose how to handle these tasks.

    For WBS Summaries, you can choose to:

    • Ignore them from the import so they will be excluded.

    • Import as Tasks. If imported, WBS summaries will convert to Task Dependant types.

    For Level of Effort (LoE) Tasks you can select from:


    Milestones in your file will always be imported as Milestones in Aphex. You can also choose to set the imported Milestone date as a Target Date - this gives you a stable benchmark to compare against, so you can easily see how the Milestones in the short-term plan are tracking against your baseline or contract dates.

    • Set Milestone Target Date from the imported Dates

    • Do nothing

    • Click


    Map the right data across. Task names, logic, and calendars come through automatically, but you can also import WBS structure, assign Owners, Notes, Locations, or Subcontractors based on your UDFs, and bring over key metadata that helps delivery teams plan faster.

    • To import your current WBS into your Project's Folder tree, select the WBS option from the Folder Code drop-down list.

    • Additionally, you can also import Subcontractor, Location, Owner and Notes, if you've predefined these in your source tool before exporting.


    This is your final review before Tasks are imported into the Project. You'll see a summary of what's about to be created, including Task counts & any new assets. If any changes were made during the process, you can download a CSV to review the modifications. Nothing has been created yet - confirm when you're ready.

    • Review the data you're importing

    • Download the skipped tasks, folders or modifications CSV

    • Select


    Before your newly imported work appears on the Gantt, your next step is to distribute tasks to the team. Then, once tasks have been assigned to an owner, the user will be notified that they have newly imported work waiting for them to add to the plan.

    1
    • Click your Project Title

    • Click Master Schedule Imports, then navigate to the Project Data page using the side-menu

    Printing

    Print the Gantt, Map, Board, and List views to capture exactly what you see on screen. Aphex will print configured overlays, grouping and tasks from your current view.


    Print to PDF the live Gantt to share the most up-to-date view of your plan.

    • Open a Gantt View

    • Set your Filters, Date Range, Columns, and other View Settings to match how you want your output to look

    Delete the View

  • Convert the View

  • Duplicate the View

  • Save as New View

  • Override the Saved View Definition

  • Save as New View

  • Override the Saved View Definition

  • Viewers: All Users & Teams who are not the Author or Editor for a specific View.

  • Viewers can:

    • If Shared, they can open the View from the View List

    • If Personal, they can open the View from direct URL

    • Save as New View

    • Duplicate the View

  • Show Relationship Links

    Gantt

    Group by Folder, All Future Tasks

    My Upcoming Plan

    Gantt

    Group by Folder, Filter by Owner OR Assignee = Me, Next 6 Months

    Board View

    Board

    Group by Subcontractor & Shift,This Week

    Map View

    Map

    Group by Owner, Today + One Week Forward

    Upcoming Milestones

    Gantt

    Group by Folder, Filter by Milestone = True, All Future Tasks

    Clashing Tasks View

    Gantt

    Group by Owner & Folder, Filter by Issue = Clash, All Future Tasks

    Unresolved Issues

    Gantt

    Group by Owner & Folder, Filter by Issue = Clash OR Missing Data OR Overdue Blocker, All Future Tasks

    My Daily Briefing List

    List

    Group by Schedule, Filter by Owner OR Assignee = Me, Today

    Project Daily Briefing List

    List

    Group by Schedule, Filter by Owner OR Assignee = Me, Today

    Package

    Owner

    Folder

    Subcontractor

    Subcontractor

    Shift

    Shift

    Location

    Location

    Assignee

    Assignee

    None

    Shift

    The colour of the Task Shift

    Owner

    The user colour of the Task Owner

    You can also skip this step by leaving both dropdowns blank and clicking

    Ignore all LoE tasks and these will not be imported (this is the recommended option)

  • Import LoE tasks as task dependant types without links

  • Import LoE tasks as task dependant types with links - Selecting this option may cause variance in your import

  • Once you've made your selection, select to move to the next step

    Check Driving Predecessors

    There may be some Tasks that are being driven by Tasks outside of your import dates. This can sometimes result in variance. The decisions for this step include:

    For Driving Predecessor Tasks, you can choose to:

    • Add missing Tasks to the import scope (this is the recommended option)

    • Remove non-driving Links between selected Tasks.

    • Do nothing

    For Driving Predecessors Level of Effort Tasks you can select from:

    • Remove non-driving Links between selected Tasks (this is the recommended option)

    • Add missing Tasks to the import scope

    • Do nothing

    Once you've made your selection, select to move to the next step

    Handle Actual Dates

    Aphex uses Task Status to define a Task state & scheduling behaviour. Decide how you would like to handle tasks with Actual Dates.

    For Actual Starts, you can choose to:

    • Import without Predecessor Links (this is the recommended option)

    • Import with Predecessor Links

    For Actual Finishes you can select from:

    • Set Task Status to Done (this is the recommended option)

    • Do nothing

    Once you've made your selection, select to move to the next step

    Open the Unassigned tab

  • Select an owner for each task with the drop-down menu

  • Click

  • 2

    Add Tasks to the Plan

    If you're a user who has been assigned new tasks from an import, they'll appear in your Backlog. All you need to do is pull them onto the Gantt.

    To add your Tasks to the Plan:

    • Click your Project Title

    • Click Master Schedule Imports, then navigate to the Project Data page using the side-menu

    • Click

    Prepare your file before exporting

    Filter (Optional)

    UDFs allow you to filter to the specific data you want to import into Aphex:

    • In your master schedule, create a User Defined Field (you might want to name this something straightforward: Aphex Filter)

    • In this UDF assign a consistent value against the activities you would like to import and ones you would not (this could simply be "Yes" and "No")

    Project Assets (Optional)

    Save time during your import by including Owners and Project Assets in your import file.

    You can add the email address of the user’s you’d like to assign imported work to automatically, and the subcontractor and location of each task.

    • Create a UDF for each attribute (i.e. Subcontractor, Location and Owner) you wish to pre-populate.

    • Name each UDF something memorable, like “Aphex Subcontractor”.

    • In each UDF (eg. Subcontractor or Location), insert the field (Subcontractor, location etc.) for each activity. This should be consistent with the name in your Aphex project (if not, Aphex will create a new one)

    • In the Owner UDF, insert the email address of the activity’s owner. Check that this matches the email address the team member uses for Aphex. If not, the address entered will receive an invite to join the project.

    Filter your Import Scope

    To filter what Tasks are imported into Aphex:

    Select your Date Range

    To select a Date Range

    Rules for New vs Existing Tasks
    • Only Tasks that match your chosen filter and fall within the selected date range will be considered for import.

    • You’ll see a count of how many new Tasks will be imported, based on your selection.

    • Aphex will only import Tasks that don’t already exist in the project - we identify matches by Activity ID (mapped to Aphex External ID)

    • If a Task has already been imported before (based on its Activity ID), it will be skipped - even if it’s since been updated in the source tool.

    • Imported Tasks are treated as the source of truth from the time they’re brought into Aphex - they won’t be overridden or replaced by future imports.

    Smart Checks for Unsupported Data & Variance Detection

    Check Unsupported Task Types

    Please note that you will only see the steps that apply to your Import. If your Import doesn't contain Unsupported Task Types, Driving Predecessors, Actual Dates or Milestones, it will skip these steps.

    Automatically set Milestone Target Dates

    Make a selection from:

    Target Date Creation
    • All Milestones in your file will be created as Milestones in Aphex.

    • Target Dates are automatically set to the Milestone’s end date on import. You can update these later if needed.

    • Aphex doesn’t support zero-duration tasks; so Milestones are converted to one-day activities.

    • If a one-day duration is applied, Aphex will automatically add a -1 day lag to any successor links to prevent introducing variance.

    Bring in your WBS & Other Properties

    Map Folders

    Map Other Aphex Properties

    Asset Creation & Mapping Rules
    • Only data associated with activities you are importing will be included. i.e Folder codes unrelated to any imported activities will not be brought into Aphex.

    • If a Folder code already exists in the project, imported activities with that code will be grouped into the existing Folder, even if the Folder names don’t match.

    • If an Asset (like a Subcontractor or Owner) already exists with an exact name match, the imported tasks will be assigned to it. Otherwise, a new Asset will be created.

    • The Owner field must contain email addresses. If the email matches an existing user in the project, the task will be assigned to them. If not, they’ll be invited as a new user.

    Complete & Review your Import

    To complete the import

    What Aphex Creates Automatically
    • Calendars are created if a Task uses a calendar that doesn’t already exist in the project.

      • This includes all custom working calendars, with their non-working days, RDOs, and exception rules (e.g. site shutdowns, public holidays).

      • If a calendar with the same name already exists in the Aphex project, imported Tasks will be assigned to the existing calendar instead.

    • Relationship links between Tasks in your import scope are created automatically.

      • If both linked Tasks are imported at the same time, the relationship is created during import.

      • If the successor is imported later, Aphex will automatically stitch the existing predecessor and the newly imported successor back together once both Tasks exist.

    • Shifts are assigned to every Tasks.

      • Day Shift is assigned by default.

      • Depending on task timing, Aphex may assign All Shift or Night Shift automatically.

    • External IDs are generated automatically:

      • If Primavera P6 is the source, the Activity ID becomes the External ID.

      • If Microsoft Project is the source, the External ID is built from the Project Name + ID.

    Skipped & Modified CSV Format

    Key columns in both files typically include:

    • ID

    • Name

    • Task Type

    • Modification Reason (for Modified):

      • Why the task was changed (e.g., "Task type changed", "Links removed", "Status changed to Done", "Target Date set")

    • Skipped Reason (for Skipped):

      • Why the task was skipped (e.g., "LoE Tasks Skipped", "WBS Summary Skipped")

    Folders Skipped CSV:

    • There is also a report for skipped folders, with folder-level details, e.g., folder code, name, and reason for skipping⁠

    Add Imported Tasks to the Plan

    Assign Ownership

    Here's how to allocate activities to the users responsible:

    Click and select Print View to open the Print Menu

  • From the Print Menu, you can make further adjustments to the Date Range, Page Size, and optionally toggle

  • Click to view more printing options

  • Click to download the PDF to your device


  • Print to PDF your Map View as a staging-diagram flipbook or a single page with all your Tasks and Work Areas mapped out.

    • Open a Map View

    • Set your Filters, Date Range, and other View Settings to match how you want your output to look

    • Click and select Print View to open the Print Menu

    • Position the map and click

    • Optionally and select from Day, Week or Month

    • Click for additional printing options, like adding extra columns to the output

    • Click to download the PDF to your device


    Print to PDF the Board View for a quick, whiteboard-style snapshot of the week ahead.

    • Open a Board View

    • Set your Filters, Group By, and other View Settings to match how you want your output to look

    • Click and select Print View to open the Print Menu

    • Select your Page Size & Layout

    • Click to view more printing options

    • Click to download the PDF to your device


    Print to PDF the List View to get a clear, daily to-do list of upcoming work.

    • Open a List View

    • Set your Filters, Group By, and other View Settings to match how you want your output to look

    • Select the Page Size

    • Click to download the PDF to your device


    Need a hard copy of your published plan? You can print to PDF a published version to share a snapshot of the project exactly as it was at the time it was published.

    • Open the Published Version

    • Click and select Print Gantt

    • Select the Date Range you want to print, page size, and optionally toggle

    • Click to view more printing options

    • Click to download the PDF to your device

    • Open the Published Version

    • Click and select Print Map

    • Position the map and click

    • Optionally and select from Day, Week or Month

    • Click for additional printing options

    • Click to download the PDF to your device


    Notifications appear during loading to keep you informed of progress and potential delays.

    Who can use this feature

    All Project users are able to print from the Project.


    Guests and Non-Aphex Users are able to print Shared Published Versions.

    Print Gantt View

    To print the Gantt:

    How Auto-Zoom Works
    • Automatic Zoom - If your selected date range significantly compresses the timeline, Planner automatically increases the zoom level to ensure readable output. A message will appear in the print settings to let you know the view has switched.

    • Manual Override - You can manually restore your original zoom selection at any time by clicking

    Advanced Settings
    Setting
    Description

    Print Map View

    To print the Map:

    Advanced settings
    Setting
    Description
    Sequencing Outputs
    Sequence
    Output

    Print Board View

    To print Board:

    Advanced Settings
    Setting
    Description

    Print List View

    To print List:

    Advanced Settings
    Setting
    Description

    Print Published Versions

    To Print the Published Gantt:

    Advanced settings
    Setting
    Description

    To Print the Published Map:

    Advanced settings
    Setting
    Description
    Sequencing Outputs
    Sequence
    Output

    Printing Errors

    Processing Print

    This is taking longer than normal due to external layers

    A Print with Loaded Data button will appear and allow you to generate a print with the data that has already loaded. Your printout will show a Data partially loaded label beside the timestamp to show that the loading process was stopped before completion

    Processing Print Failed

    Internal Server Error - please try running your print again

    This could be an issue with Aphex’s printing server. Please try your print again after a short wait, or get in touch with support if the error persists

    Memory Timeout - reduce the amount of data you're printing or run your print in batches

    This means that the generated PDF was too large to load. Please try reducing the date range, sequencing frequency, or map layer quantity

    Network Issue - please contact your IT team/network team to check our printer functions have access

    This is a connection issue that could be caused by a poor wifi signal or an internal firewall blocking our print server. Please get in touch with your IT team to troubleshoot

    The second task starts when the first task starts.

    Start > Finish (SF)

    The second task finishes when the first task starts.

    Finish > Start (FS)

    The second task starts when the first task finishes.

    Finish > Finish (FF)

    The second task finishes when the first task finishes.

    Folders

    In Aphex, the project’s WBS is built using Folders. Folders and Subfolders are how teams organise and group Tasks across the plan - whether you're pulling in a detailed structure from P6 or Asta, or building a more streamlined setup to suit daily and weekly site planning.


    Root Folders sit at the top of your Folder hierarchy - everything else rolls up into them. You can create one directly from the Gantt while planning, or use the Folders Management page to build out your structure more intentionally.

    • Make sure that your set to Folders

    • An option to Add Root Folder

    Pick from either Owner, Subcontractor or Shift for the Bar Colour on the Gantt print. Owner will be selected by default.

    Group Dates & Durations

    Select whether to print Filtered or Total Start Dates, End Dates, and Durations for Folders, Packages, and Parent Tasks. This lets you control whether your printout shows only visible tasks or the whole group span.

    Include footer

    To Include/Exclude the Footer at the bottom of the page

    Logo

    The PDF can be generated with either the Organisation Logo, or the Project's logo.

    Print Size

    A0

    A1

    A2

    A3

    To Include/Exclude clashes in the print.

    Column Data

    Up to three additional data points can be shown next to their tasks on the Map Print.

    Include footer

    To Include/Exclude the Footer at the bottom of the page

    Logo

    The PDF can be generated with either the Organisation logo, or the Project's logo.

    Map Print Page Size

    A0

    A1

    A2

    A3

    A new page for each week. Only tasks taking place within the specific week will appear on the page.

    Month

    A new page for each month. Only tasks taking place within the month week will appear on the page.

    The PDF can be generated with either the Organisation logo, or the Project's logo.

    Board Print Size

    A0

    A1

    A2

    A3

    The PDF can be generated with either the Organisation logo, or the Project's logo.

    List Print Size

    A3

    A4

    Select whether to print Filtered or Total Start Dates, End Dates, and Durations for Folders, Packages, and Parent Tasks. This lets you control whether your printout shows only visible tasks or the whole group span.

    Include footer

    To Include/Exclude the Footer at the bottom of the page

    Logo

    The PDF can be generated with either the Organisation logo, or the Project's logo.

    Gantt Print Size

    A0

    A1

    A2

    A3

    To Include/Exclude clashes in the print.

    Column Data

    Up to three additional data points can be shown next to their tasks on the Map Print.

    Include footer

    To Include/Exclude the Footer at the bottom of the page

    Logo

    The PDF can be generated with either the Organisation logo, or the Project's logo.

    Print Size

    A0

    A1

    A2

    A3

    A new page for each week. Only tasks taking place within the specific week will appear on the page.

    Month

    A new page for each month. Only tasks taking place within the month week will appear on the page.

    Delay Data

    Delay data includes Progress Update colours, Done & Promised bars and Delay icons.

    Work Area Colour

    Pick from either Owner, Subcontractor or Shift for the Bar Colour on the Gantt print. Owner will be selected by default.

    Day

    A new page for each working day. Only tasks taking place on the specific day will appear on the page.

    Include footer

    To Include/Exclude the Footer at the bottom of the page

    Include footer

    To Include/Exclude the Footer at the bottom of the page

    Bar colour

    Pick from either Owner, Subcontractor or Shift for the Bar Colour on the Gantt print. Owner will be selected by default.

    Work Area Colour

    Pick from either Owner, Subcontractor or Shift for the Bar Colour on the Gantt print. Owner will be selected by default.

    Day

    A new page for each working day. Only tasks taking place on the specific day will appear on the page.

    Network Troubleshooting

    Bar colour

    Show Clashes

    Week

    Logo

    Logo

    Group Dates & Durations

    Show Clashes

    Week

    will appear on the Gantt
    • Click your Project Title in the top left, then select Project Assets

    • Select Folders from the menu

    • Click

    • Add a Folder Name and update the code if needed

    • Click Save

    • The Folder is added to the project structure, ready for the team to add Tasks into


    Subfolders help you build out your Folder Structure with as much detail as your plan needs. You can nest Subfolders as deep as required - there's no limit!

    From the Folders Management Page:

    • Click your Project Title in the top left, then select Project Assets

    • Select Folders from the menu

    • Hover over the Folder you would like to add a Subfolder to

    • Click on the + symbol

    • Select Add Sub-Folder

    • Add a Folder Name and update the code if needed

    • Click Save Changes

    • The Subfolder is added to the project structure, ready for the team to add Tasks into

    • Hover over the Folder you are adding to

    • Click on the + symbol

    • Select Add Subfolder

    • Type in the Subfolder Name & select the Create [Folder Name] button


    If parts of your Folder Structure need to stay exactly as they are, you can apply Folder Protection. You can lock down changes to names, codes, position, or structure - including the ability to add Subfolders.

    • Click your Project Title in the top left, then select Project Assets

    • Select Folders from the menu

    • Locate the Folder you'd like to Protect

    • Click the in the State column to cycle through the various Protected States:

      • Default

      • Semi-Protected

      • Protected

    • Click Save Changes


    Reordering Folders is quick and flexible. Move a single Folder or an entire branch - just remember that the Folder Structure is shared with everyone on the project, so your updates will apply project-wide.

    • Click your Project Title in the top left, then select Project Assets

    • Select Folders from the menu

    • Hover over the Folder name & click and hold to the left of the checkbox

    • Drag the Folder to move it

    • Click Save Changes

    To move a Folder using the Overflow Menu

    • Hover over the Folder & click the ...

    • Select Move to bring up the menu

    • Click on the Folder you want to move to & confirm using the button

    • Click Save Changes


    You can duplicate Folders to help build out your Folder Structure faster – avoiding the need to recreate similar setups manually.

    From the Folders Management Page:

    • Click your Project Title in the top left, then select Project Assets

    • Select Folders from the menu

    • Hover over the Folder & click the ...

    • Choose one of the two duplication options:

      • Duplicate – duplicates only the selected Folder.

      • Duplicate Branch – duplicates the Folder and all its Sub-Folders.

    • Click Save Changes

    From the Gantt:

    • Locate the Folder(s) you want to duplicate.

    • Hover over the Folder & click the ...

    • Choose one of the two duplication options:

      • Duplicate – duplicates only the selected Folder and the tasks visible within it.

      • Duplicate Branch – duplicates the Folder, all its Sub-Folders, and the tasks visible within them.

    • Choose one of the two options in the Task Ownership Modal

      • Keep original Owners

      • Assign Ownership to me

    • Click Confirm Duplicate


    To use the Folder Importer, upload a spreadsheet with both a Code and Name for each Folder.

    The importer works with CSVs exported from other planning tools. If your system doesn’t support folder exports, you can copy folder codes and names manually into our template.

    • Click your Project Title in the top left, then select Project Assets

    • Select Folders from the menu

    • Click

    • Choose either Upload a File or Copy and Paste

    • Add your data (upload CSV or copy and paste)

    • Map both the Folder Code and Name fields

    • Review your data

    • Complete the Import

    See also: import Folders from your Master Schedule


    Folders can be deleted one by one or in bulk - whatever works best for your clean-up.

    • Click your Project Title in the top left, then select Project Assets

    • Select Folders from the menu

    • Hover over the Folder you wish to delete

    • Select ... and then Delete Folder


    This organises your Tasks by the Folders they belong to. It's a simple way to view your plan in the same structure used across the Project.

    • Click the menu in the top left of the Gantt

    • Pick Folder as a Primary Grouping

    • Click the menu in the top left of the Gantt

    • Select the button next to Folder to switch to Flattened Folders

    • Flattened Folders shows only the lowest level Folder for each Task in a single row

      • The full Folder path appears above the Folder Name, saving vertical space

    • Click the same icon again to return to Folder Tree mode

      • Folder Tree shows your full Folder hierarchy, one row per level, so you can see exactly where each Tasks sits in the structure.


    Apply a Folders Filter to see only the Tasks sitting in certain parts of your Project structure.

    • Click and

    • Select Folder in the first dropdown

    • Select the Operator in the second dropdown

      • Is Within to reveal Tasks that sit inside the selected branch

      • Is to reveal Tasks that belong to the specific Folder

    • Pick your Folders in the third dropdown

    • Click Apply Selected

    See also: create & share Views

    Who can access this feature?

    Project Admins can run Master Schedule Imports.

    Create a Root Folder

    From the Gantt

    From the Folders Management Page:

    Folder Code Logic
    • Each Folder has a unique code

    • If a duplicate code is attempted to be created, the code will autocorrect to <value>[duplicate] until it is edited back to a unique code

    Create a Subfolder

    From the Gantt:

    Protect a Folder

    To Protect a Folder:

    Protected Folder State Definitions

    Folders will have one three states:

    State
    Edit Name & Code
    Move
    Delete
    Add Subfolder

    Moving Folders

    To move a Folder using Drag & Drop

    Moving Branches and Individual Folders
    • Folder codes update to match their new Parent. If you move a Folder, its code prefix will adjust to reflect its new location.

    Move the entire Folder Branch:

    • All your selected Folders (& contained Subfolders) will keep their original nested positions after being moved under the destination Folder.

    Duplicating Folders

    Folder State & Naming
    • All duplicated folders are created in an unprotected state, regardless of the original folder's status.

    • The duplicated folder will copy the name and colour from the original.

    • The folder code will receive a

    Permissions

    Folder duplication permissions vary based on your role and whether Root Folder Creation is enabled:

    Project Setting
    Admin User Action
    Member User Action
    Folder State & Naming
    • All duplicated folders are created in an unprotected state, regardless of the original folder's status.

    • The duplicated folder will copy the name and colour from the original.

    Permissions & Task Ownership

    Folder duplication permissions vary based on your role and whether Root Folder Creation is enabled:

    Project Setting
    Admin User Action
    Member User Action

    Import Folders from a CSV

    To format your Import File:

    To run a Folder Import:

    Folder Import Data Format
    Property
    Format
    Importer Logic: Duplicates & Branch Creation
    • The importer automatically warns and excludes any duplicate Folder codes

    • The importer will autocomplete branches where they are missing in the source file.

      For example, a Folder Code imported as East.123.A.1 will automatically create the parent nodes of East, East.123, and East.123.A if they are not included in either the source file or the existing Aphex project

    Deleting Folders

    To delete a Folder:

    Folder Deletion Rules
    • Folders that contain Tasks can not be deleted - the Tasks need to be ejected from the Folder first

    • Deleted Folders are automatically removed from the Project's Structure and Gantt

    • Deleted Folders cannot be restored

    Group by Folder

    To Group By Folder on the Gantt:

    To switch between Folder Tree and Flattened Folders:

    Filter by Folder

    To set a Folder Filter:

    Filter Breakdown
    Filter
    Operator
    Value
    Folders use a tree-style structure - each level down the tree adds another decimal place to the code, showing its position in the hierarchy

    Default

    ✓

    ✓

    ✓

    ✓

    Semi-Protected

    -

    -

    -

    Move the selected Folders only:
    • All your selected Folders (& contained Subfolders) will be flattened to the same level under the destination Folder.

    [duplicate]
    suffix.

    Can duplicate any folder or branch.

    All duplication options are disabled.

    Admins & Members (Allow Root Folders: On)

    Can duplicate any folder or branch.

    Can duplicate any folder or branch.

    Admins & Members (Allow Root Folders: Off)

    Can duplicate any folder or branch.

    Cannot duplicate root-level folders, but can duplicate any nested folders.

    The folder code will receive a
    [duplicate]
    suffix.

    Can duplicate any folder or branch.

    All duplication options are disabled.

    Admins & Members (Allow Root Folders: On)

    Can duplicate any folder or branch.

    Can duplicate any folder or branch.

    Admins & Members (Allow Root Folders: Off)

    Can duplicate any folder or branch.

    Cannot duplicate root-level folders, but can duplicate any nested folders.

    When duplicating tasks, ownership is handled differently depending on your role and selected option:

    User Role
    Keep Original Owners
    Assign Ownership to Me

    Admin

    All duplicated tasks will keep their original owners.

    All duplicated tasks will be assigned to you.

    Member (No Delegate Permissions)

    Tasks owned by other users will be skipped and not duplicated.

    Folder Name

    Any String

  • Opting to delete the entire Folder branch will delete the selected row, and all Folders nested underneath

  • Folder Code

    A period-separated code (sometimes called WBS path)

    Example; East.123.A.1

    This would be imported as

    • East

      • 123

        • A

          • 1

    Folder

    Is Is Not Is Within Is Not Within Is Empty Is Not Empty

    Sample Folder Import

    create new root

    Admins Only

    Admins Only

    Multi-select

    ✓

    Protected

    -

    -

    -

    -

    All duplicated tasks will be assigned to you.

    Member (With Delegate Permissions)

    Tasks owned by other users will be skipped unless you have delegate permissions.

    All duplicated tasks will be assigned to you.