Briefings turns your live plan into a printable, shareable Daily Brief for your crews. Set up a Briefing Template once, choosing the tasks, maps and columns you want to show, then hit Publish each day to generate a PDF from the latest version of your plan. Share the Brief via link or QR code with the crew.
Every Daily Brief is saved to the template's history, giving you a dated record of exactly what was briefed to the crew on any given day.
A Briefing Template stores the layout of your brief, so you only need to set it up once. Each template has a name, a date and one or more Sections.
To create a Briefing Template:
Click your Project Title in the top left
Select Project Assets
Select Briefings from the Planner section of the menu
Click + Create New Briefing Template
Enter a name for your template
Select a date. Use the Today or Tomorrow shortcuts, or pick a future date from the calendar
Click in the bottom left corner and choose Location or Task Table to add your first Section
Configure your Section and add as many more as you need
Click Create & Publish Briefing to save the template and publish your first Daily Brief
To save the template without publishing, click and select Create Briefing Template Only.
Location Sections show a map of your site with Work Areas, Markups and Connected Layers, plus an optional table of the Tasks happening there.
To add a Location Section:
Click and select Location
Choose a from your Project's library
The map will zoom to fit the Tasks scheduled for the template's date
Optionally click Set Map Extent to pan, zoom or rotate the map to a custom framing, then click Set Map Extent to confirm
Task Table Sections show a list of Tasks without a map. They use the same filters, grouping and columns as the Task Table in a Location Section.
To add a Task Table Section:
Click and select Task Table
Set your filters to choose which Tasks are shown
Optionally select a Grouped by option
Click + Add Column to add the columns you need, and drag and drop them to reorder
Sections can be reordered, duplicated and copied between, so you can quickly build up a multi-page brief. For example, you could add a map for each area of site, followed by a full Task Table.
To reorder Sections:
Drag and drop a Section card in the strip at the bottom of the page
Or, click ... on the Section card (or right-click the Section) and select Move Left or Move Right
To add a Section in a specific position:
Click ... on a Section card
Select Insert Before or Insert After
Choose Location or Task Table
To copy settings between Sections:
Click ... on the Section you want to copy and select Copy Config
Click ... on the Section you want to update and select Paste Config
Publishing pulls the latest Tasks and plan into your template and creates a new Daily Brief. You can publish from the Briefings page or from inside the template.
To publish a Daily Brief:
Click your Project Title in the top left
Select Project Assets
Select Briefings from the Planner section of the menu
Click Publish on the template's row
For more on how Distribution Settings work, see .
Click into any template to see every Daily Brief it has published. It's a quick way to check exactly what the crew was briefed on any given day.
To open a Daily Brief:
Click your Project Title in the top left
Select Project Assets
Select Briefings from the Planner section of the menu
Click into a template
Get the Brief to the team, without anyone sending it by hand. Every Briefing Template has a public, no-login link, an optional QR code to stick up on site, and a list of Project Users who get an email the moment a Brief is Published.
To Share the Daily Brief:
Click your Project Title in the top left
Select Project Assets
Select Briefings
Click into a Published Briefing Template
Brief Template Distribution settings can be changed at any time after the first Publish.
To manage Notified Recipients:
Click on the Project Name in the top left corner
Select Project Assets
Under Planner, select Briefings
Click into a Published Briefing Template
Delete a single Daily Brief if it was published by mistake or is no longer needed. Deleting a Daily Brief only removes that one publish. The template and its other Daily Briefs aren't affected.
To delete a Daily Brief from the template:
Click your Project Title in the top left
Select Project Assets
Select Briefings from the Planner section of the menu
Click into a template
Duplicating a template copies every Section and setting, making it easy to set up a similar brief for another trade, shift or area of site.
To duplicate a template:
Click your Project Title in the top left
Select Project Assets
Select Briefings from the Planner section of the menu
Hover over a template and click ...
Duplicating a Template does not copy Recipients and the QR code over to the duplicate.
Archiving a template stops it from being published, but keeps the template and all of its Daily Briefs. You can restore an archived template at any time.
To archive a template:
Click your Project Title in the top left
Select Project Assets
Select Briefings from the Planner section of the menu
Hover over a template and click ...
To restore an archived template:
Click your Project Title in the top left
Select Project Assets
Select Briefings from the Planner section of the menu
Hover over an archived template and click ...
To delete a template:
Archive the template first
Hover over the archived template and click ...
Select Delete Briefing Template
Type delete to confirm
See also:
Set your filters, layout, columns and map settings. The preview will update as you make changes
Configure the Brief: Edit filters, grouping, remove columns or rearrange the sections. Any changes you make here will update the Briefing Template.
Click Publish Daily Brief
Configure Distribution Settings:
Notified Recipients: click + Add Recipient and search for a Project User.
QR code: click Generate QR Code
Automatically switch to newest version: toggle on/off.
New day starts at: pick a time from the dropdown.
Click Finish & Publish Daily Brief
Use the zoom and rotate controls to adjust the page
Click to open Full Screen mode, and use your arrow keys to move between pages
At the bottom left of the page:
Click to Download a PDF
Click to Copy URL
If a QR has been generated, click to Download the QR Code, choose to download as a PDF or PNG
Click +Add Recipient and search for a Project User.
To remove Notified Recipients, click ... in the Users row, and select Remove User
...Select Delete Daily Brief
Select Duplicate Briefing Template
The copy will be named with a number at the end, e.g. Site A Morning Brief-01
Select Archive Briefing Template
Select Restore Briefing Template
Project Users can still see the Briefs inside Aphex
Restoring the Template brings back the same Shareable Link and QR code, so posters don’t need reprinting
Generating a new code after deleting creates a different code. The Shareable Link keeps working either way.
New day starts at (default 00:00) sets when the next day’s Brief becomes Current, in the Project’s time zone.
Changes to either setting reach screens that are already open on their next refresh, not live.
Layout
Show the Task Table on the same page as the map (Combined), or on its own page (Separate Page). Combined is selected by default
Grouped by
Group the Task Table by Owner, Package, Folder, Subcontractor or Shift
Columns
Click + Add Column to add columns to the Task Table. Drag and drop to reorder them
Labels
Show Task Names or Reference Numbers on the map. Task Names is selected by default
Work Area Colour
Pick from either Owner, Subcontractor or Shift for the Work Area colour. Owner is selected by default
Show Clashes
To Include/Exclude clashes on the map
Layers
Show or hide Markups and Connected Layers, and select a Basemap of Satellite, Street or None
Insert Before / After
Add a new Section before or after the selected Section
Duplicate Section
Create a copy of the Section, including its Location, directly after the original
Delete Section
Remove the Section from the template
Automatically switch to newest version
Toggle on or off
New day starts at
Click the drop down and select a time