Folders
In Aphex, the project’s WBS is built using Folders. Folders and Subfolders are how teams organise and group Tasks across the plan - whether you're pulling in a detailed structure from P6 or Asta, or building a more streamlined setup to suit daily and weekly site planning.
Create a Root Folder
Root Folders sit at the top of your Folder hierarchy - everything else rolls up into them. You can create one directly from the Gantt while planning, or use the Folders Management page to build out your structure more intentionally.
From the Gantt
Make sure that your
set to
FoldersAn option to
Add Root Folderwill appear on the Gantt
From the Folders Management Page:
Click your Project Title in the top left, then select
Project AssetsSelect
Foldersfrom the menuClick
Add a Folder Name and update the code if needed
Click
SaveThe Folder is added to the project structure, ready for the team to add Tasks into
Create a Subfolder
Subfolders help you build out your Folder Structure with as much detail as your plan needs. You can nest Subfolders as deep as required - there's no limit!
From the Folders Management Page:
Click your Project Title in the top left, then select
Project AssetsSelect
Foldersfrom the menuHover over the Folder you would like to add a Subfolder to
Click on the
+symbolSelect
Add Sub-FolderAdd a Folder Name and update the code if needed
Click
Save ChangesThe Subfolder is added to the project structure, ready for the team to add Tasks into
From the Gantt:
Hover over the Folder you are adding to
Click on the
+symbolSelect
Add SubfolderType in the Subfolder Name & select the
Create [Folder Name]button
Protect a Folder
If parts of your Folder Structure need to stay exactly as they are, you can apply Folder Protection. You can lock down changes to names, codes, position, or structure - including the ability to add Subfolders.
To Protect a Folder:
Click your Project Title in the top left, then select
Project AssetsSelect
Foldersfrom the menuLocate the Folder you'd like to Protect
Click the
in the
Statecolumn to cycle through the various Protected States:DefaultSemi-ProtectedProtected
Click
Save Changes
Moving Folders
Reordering Folders is quick and flexible. Move a single Folder or an entire branch - just remember that the Folder Structure is shared with everyone on the project, so your updates will apply project-wide.
To move a Folder using Drag & Drop
Click your Project Title in the top left, then select
Project AssetsSelect
Foldersfrom the menuHover over the Folder name & click and hold to the left of the checkbox
Drag the Folder to move it
Click
Save Changes
To move a Folder using the Overflow Menu
Hover over the Folder & click the
...Select
Moveto bring up the menuClick on the Folder you want to move to & confirm using the
button
Click
Save Changes
Duplicating Folders
You can duplicate Folders to help build out your Folder Structure faster – avoiding the need to recreate similar setups manually.

From the Folders Management Page:
Click your Project Title in the top left, then select
Project AssetsSelect
Foldersfrom the menuHover over the Folder & click the
...Choose one of the two duplication options:
Duplicate– duplicates only the selected Folder.Duplicate Branch– duplicates the Folder and all its Sub-Folders.
Click
Save Changes
From the Gantt:
Locate the Folder(s) you want to duplicate.
Hover over the Folder & click the
...Choose one of the two duplication options:
Duplicate– duplicates only the selected Folder and the tasks visible within it.Duplicate Branch– duplicates the Folder, all its Sub-Folders, and the tasks visible within them.
Choose one of the two options in the Task Ownership Modal
Keep original OwnersAssign Ownership to me
Click
Confirm Duplicate
Import Folders from a CSV
To use the Folder Importer, upload a spreadsheet with both a Code and Name for each Folder.
To format your Import File:
The importer works with CSVs exported from other planning tools. If your system doesn’t support folder exports, you can copy folder codes and names manually into our template.
To run a Folder Import:
Click your Project Title in the top left, then select
Project AssetsSelect
Foldersfrom the menuClick
Choose either
Upload a FileorCopy and PasteAdd your data (upload CSV or copy and paste)
Map both the
Folder CodeandNamefieldsReview your data
Complete the Import
See also: import Folders from your
Deleting Folders
Folders can be deleted one by one or in bulk - whatever works best for your clean-up.
To delete a Folder:
Click your Project Title in the top left, then select
Project AssetsSelect
Foldersfrom the menuHover over the Folder you wish to delete
Select
...and thenDelete Folder
Group by Folder
This organises your Tasks by the Folders they belong to. It's a simple way to view your plan in the same structure used across the Project.
To Group By Folder on the Gantt:
Click the
menu in the top left of the Gantt
Pick
Folderas a Primary Grouping
To switch between Folder Tree and Flattened Folders:
Click the
menu in the top left of the Gantt
Select the button next to
Folderto switch toFlattened FoldersFlattened Foldersshows only the lowest level Folder for each Task in a single rowThe full Folder path appears above the Folder Name, saving vertical space
Click the same icon again to return to
Folder TreemodeFolder Treeshows your full Folder hierarchy, one row per level, so you can see exactly where each Tasks sits in the structure.
Filter by Folder
Apply a Folders Filter to see only the Tasks sitting in certain parts of your Project structure.
To set a Folder Filter:
Click
and
Select
Folderin the first dropdownSelect the Operator in the second dropdown
Is Withinto reveal Tasks that sit inside the selected branchIsto reveal Tasks that belong to the specific Folder
Pick your Folders in the third dropdown
Click
Apply Selected