Project Settings is where project Project Admins can edit the Project's basic properties as well as configure the Aphex Project to align with your team's weekly Planning Routine. You can navigate to Project Settings from the left-hand Sidebar that's accessible by clicking on the Aphex icon in the top-left of your project.

Project Details

Group_184.png

1. Project Name

Insert the name of the Project here.

2. Project ID

The unique identification for the Project in Aphex, alongside the external ID of the Project is being Imported.

3. Location

The geographical location of the Project, used to bring in accurate weather data.

4. Sector

The industry sector the Project is a part of.

5. Form of Contract

The type of contract used for the Project.

6. Contract Value

The total monetary value of the Project's contract.

Import Frequency

Group_206.png

1. Start Date Options

Chooses the date and time that Importing starts on.

2. Frequency Selector

Chooses the frequency and time period that Imports should happen in.

3. End Date Options

Chooses how long the Import cycle goes on for, and which date it will end on.

Publication Frequency

Group_201.png

1. Start Date Options

Chooses the date and time that Publication starts on.

2. Frequency Selector

Chooses the frequency and time period that Publishing should happen in.

3. End Date Options

Chooses how long the Publication cycle goes on for, and which date it will end on.

Lookahead Period

Group_196.png

1. Lookahead Period

This determines the project's default view of the Gantt. Aphex will only be checking for Missing Data and Clashes within the project's Lookahead Period.

Publication Requirements

Group_195.png

1. Required Fields

These 7 Task Properties can be selected as Required Fields, critical information necessary in the plan.

Power BI Data

Group_189.png

1. Power BI URL

The URL used to connect a Project as a Power BI data source when Power BI is turned on.